SAMPLE PROJECT · Invented data, read-only · Back to xpcspine.com
XPC Spine PM3-REBUILDPaper Machine 3 Press and Dryer Section Rebuild
Help

Parallel run

Prove the platform against the board you use today. Write down what your current board shows for a date, upload it here, and the platform works out the same figures from the same sources for that date. Every line shows MATCH, DIFFERENT, or MISSING on one side, and every run is kept as the pilot's record.

Check a day's figures

Download a blank sheet for every board

Board is the trade code or board name. Measures: late_activities (Late activities), due_7_days (Due in 7 days), pct_complete (Percent complete), cost_performance (Cost performance (CPI)), drawings_current (Drawings current), open_watch_items (Open watch items), overdue_watch_items (Watch items past needed-by). Leave a value blank where the old board shows nothing.

Runs so far

RunAs ofMatchDifferentTo check
12026-10-2135 10