XPC Spine PM3-REBUILDPaper Machine 3 Press and Dryer Section Rebuild
Help

Northfield Millwright Services ?

Scope view: this contractor's activities, every missed schedule date and the explanation given for it. All contractors

Missed dates needing your explanation (0)

Nothing outstanding. Every missed date has an explanation on record.

Source: missed_date · asked when a planned finish passes unfinished or slips between P6 uploads

Explanations on record

IF07 Install felt roll FR-07 (top felt) ACCEPTED

Missed 2026-08-27, now 2026-08-30 (+3 d) · Other

Finish moved inside the activity's float; no successor was held.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

IF07 Install felt roll FR-07 (top felt) ACCEPTED

Missed 2026-08-24, now 2026-08-27 (+3 d) · Other

Finish moved inside the activity's float; no successor was held.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

IB06 Install blow box BB-6 ACCEPTED

Missed 2026-08-23, now 2026-08-26 (+3 d) · Design, drawing or RFI

Follows delay D-004: Blow box BB-2 supply duct flange does not match.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-23T13:36:00 · accepted by Elena Varga, CM on 2026-08-23

IF06 Install felt roll FR-06 (top felt) ACCEPTED

Missed 2026-08-23, now 2026-08-26 (+3 d) · Other

Finish moved inside the activity's float; no successor was held.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

IB02 Install blow box BB-2 ACCEPTED

Missed 2026-08-22 · Design, drawing or RFI

BB-2 cannot be bolted to the existing supply duct: the flange bolt circle does not match.

Recovery: Set BB-2 on its supports now; bolt up when the adapter flange arrives. BB-3 to BB-6 continue in order. by 2026-08-25

Submitted by General Foreman, Northfield Millwright Services at 2026-08-23T13:35:00 · accepted by Elena Varga, CM on 2026-08-30

IB05 Install blow box BB-5 ACCEPTED

Missed 2026-08-22, now 2026-08-25 (+3 d) · Design, drawing or RFI

Follows delay D-004: Blow box BB-2 supply duct flange does not match.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-23T13:36:00 · accepted by Elena Varga, CM on 2026-08-23

IF02 Install felt roll FR-02 (top felt) ACCEPTED

Missed 2026-08-22 · Other

Finish moved inside the activity's float; no successor was held.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

IF05 Install felt roll FR-05 (top felt) ACCEPTED

Missed 2026-08-22, now 2026-08-25 (+3 d) · Other

Finish moved inside the activity's float; no successor was held.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

IB04 Install blow box BB-4 ACCEPTED

Missed 2026-08-21, now 2026-08-24 (+3 d) · Design, drawing or RFI

Follows delay D-004: Blow box BB-2 supply duct flange does not match.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-23T13:36:00 · accepted by Elena Varga, CM on 2026-08-23

IF04 Install felt roll FR-04 (top felt) ACCEPTED

Missed 2026-08-21, now 2026-08-24 (+3 d) · Other

Finish moved inside the activity's float; no successor was held.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

IB03 Install blow box BB-3 ACCEPTED

Missed 2026-08-20, now 2026-08-23 (+3 d) · Design, drawing or RFI

Follows delay D-004: Blow box BB-2 supply duct flange does not match.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-23T13:36:00 · accepted by Elena Varga, CM on 2026-08-23

IF03 Install felt roll FR-03 (top felt) ACCEPTED

Missed 2026-08-20, now 2026-08-23 (+3 d) · Other

Finish moved inside the activity's float; no successor was held.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

IB02 Install blow box BB-2 ACCEPTED

Missed 2026-08-19, now 2026-08-22 (+3 d) · Design, drawing or RFI

Follows delay D-004: Blow box BB-2 supply duct flange does not match.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-23T13:36:00 · accepted by Elena Varga, CM on 2026-08-23

IF02 Install felt roll FR-02 (top felt) ACCEPTED

Missed 2026-08-19, now 2026-08-22 (+3 d) · Material delivery

Follows delay D-006: Felt roll FR-02 bearing housing bore undersize at receipt.

Recovery: Work follows on as soon as the predecessor is done; crews held on site.

Submitted by Site Manager, Northfield Millwright Services at 2026-08-30T09:00:00 · accepted by Elena Varga, CM on 2026-08-30

Source: missed_date, missed_date_doc

Pay applications

Contract $3,229,900 (includes approved changes $79,900) · certified to date $3,229,900 · retainage held $322,990 · paid $2,906,910

No.Period endClaimed to dateCertified to dateRetainageBack-charges offPayment dueStatus
42026-09-21$3,229,900 $3,229,900 $322,990 $1,574,910 PAID
32026-08-19$1,480,000 $1,480,000 $148,000 $864,000 PAID
22026-07-25$520,000 $520,000 $52,000 $252,000 PAID
12026-06-25$240,000 $240,000 $24,000 $216,000 PAID

Submit the next application

Agreed back-charges are taken off when the application is certified.

Source: subcontract, pay_app

Back-charges for errors on this scope

When work has to be fixed because of an error on this scope, the cost is charged back. Read the basis and evidence, then accept it or dispute it with your reasons and documents.

No back-charges on this scope.

Source: backcharge, backcharge_doc

Delays covering this scope

D-004 Blow box BB-2 supply duct flange does not match Third party · CLOSED

D-006 Felt roll FR-02 bearing housing bore undersize at receipt Third party · CLOSED

Source: delay

Activities

ActivityTradePlannedActual finish%
EN030 Gear train review: 14 bull gears and 27 idler gearsMILL 2025-11-29 → 2025-12-132025-12-13 100
PR010 Set up laydown, staging and outage trailersMILL 2026-06-20 → 2026-06-242026-06-24 100
FB110 Receive, inspect and stage all equipment at the laydownMILL 2026-07-01 → 2026-07-082026-07-08 100
OT010 Shut down, cool down, lockout and tryoutMILL 2026-08-04 → 2026-08-042026-08-04 100
OT020 Remove press and dryer feltsMILL 2026-08-05 → 2026-08-052026-08-05 100
RG01 Remove bull gear BG-01 and idler gears IG-01, IG-02MILL 2026-08-07 → 2026-08-072026-08-07 100
RG02 Remove bull gear BG-02 and idler gears IG-03, IG-04MILL 2026-08-07 → 2026-08-072026-08-07 100
RB01 Remove blow box BB-1MILL 2026-08-08 → 2026-08-082026-08-08 100
RB02 Remove blow box BB-2MILL 2026-08-08 → 2026-08-082026-08-08 100
RB03 Remove blow box BB-3MILL 2026-08-08 → 2026-08-082026-08-08 100
RB04 Remove blow box BB-4MILL 2026-08-08 → 2026-08-082026-08-08 100
RB05 Remove blow box BB-5MILL 2026-08-08 → 2026-08-082026-08-08 100
RB06 Remove blow box BB-6MILL 2026-08-08 → 2026-08-082026-08-08 100
RF01 Remove felt roll FR-01 (top felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF02 Remove felt roll FR-02 (top felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF03 Remove felt roll FR-03 (top felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF04 Remove felt roll FR-04 (top felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF05 Remove felt roll FR-05 (top felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF06 Remove felt roll FR-06 (top felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF07 Remove felt roll FR-07 (top felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF08 Remove felt roll FR-08 (bottom felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF09 Remove felt roll FR-09 (bottom felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF10 Remove felt roll FR-10 (bottom felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF11 Remove felt roll FR-11 (bottom felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF12 Remove felt roll FR-12 (bottom felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RF13 Remove felt roll FR-13 (bottom felt)MILL 2026-08-08 → 2026-08-082026-08-08 100
RG03 Remove bull gear BG-03 and idler gears IG-05, IG-06MILL 2026-08-08 → 2026-08-082026-08-08 100
RG04 Remove bull gear BG-04 and idler gears IG-07, IG-08MILL 2026-08-08 → 2026-08-082026-08-08 100
RD01 Remove dryer D-01 (top tier)MILL 2026-08-09 → 2026-08-092026-08-09 100
RD02 Remove dryer D-02 (bottom tier)MILL 2026-08-09 → 2026-08-092026-08-09 100
RG05 Remove bull gear BG-05 and idler gears IG-09, IG-10MILL 2026-08-09 → 2026-08-092026-08-09 100
RG06 Remove bull gear BG-06 and idler gears IG-11, IG-12MILL 2026-08-09 → 2026-08-092026-08-09 100
RD03 Remove dryer D-03 (top tier)MILL 2026-08-10 → 2026-08-102026-08-10 100
RD04 Remove dryer D-04 (bottom tier)MILL 2026-08-10 → 2026-08-102026-08-10 100
RG07 Remove bull gear BG-07 and idler gears IG-13, IG-14MILL 2026-08-10 → 2026-08-102026-08-10 100
RG08 Remove bull gear BG-08 and idler gears IG-15, IG-16MILL 2026-08-10 → 2026-08-102026-08-10 100
RD05 Remove dryer D-05 (top tier)MILL 2026-08-11 → 2026-08-112026-08-11 100
RD06 Remove dryer D-06 (bottom tier)MILL 2026-08-11 → 2026-08-112026-08-11 100
RG09 Remove bull gear BG-09 and idler gears IG-17, IG-18MILL 2026-08-11 → 2026-08-112026-08-11 100
RG10 Remove bull gear BG-10 and idler gears IG-19, IG-20MILL 2026-08-11 → 2026-08-112026-08-11 100
RD07 Remove dryer D-07 (top tier)MILL 2026-08-12 → 2026-08-122026-08-12 100
RD08 Remove dryer D-08 (bottom tier)MILL 2026-08-12 → 2026-08-122026-08-12 100
RG11 Remove bull gear BG-11 and idler gears IG-21, IG-22MILL 2026-08-12 → 2026-08-122026-08-12 100
RG12 Remove bull gear BG-12 and idler gears IG-23, IG-24MILL 2026-08-12 → 2026-08-122026-08-12 100
RD09 Remove dryer D-09 (top tier)MILL 2026-08-13 → 2026-08-132026-08-13 100
RD10 Remove dryer D-10 (bottom tier)MILL 2026-08-13 → 2026-08-132026-08-13 100
RG13 Remove bull gear BG-13 and idler gears IG-25, IG-26MILL 2026-08-13 → 2026-08-132026-08-13 100
RG14 Remove bull gear BG-14 and idler gear IG-27MILL 2026-08-13 → 2026-08-132026-08-13 100
RD11 Remove dryer D-11 (top tier)MILL 2026-08-14 → 2026-08-142026-08-14 100
RD12 Remove dryer D-12 (bottom tier)MILL 2026-08-14 → 2026-08-142026-08-14 100
RD13 Remove dryer D-13 (top tier)MILL 2026-08-15 → 2026-08-152026-08-15 100
RD14 Remove dryer D-14 (bottom tier)MILL 2026-08-15 → 2026-08-152026-08-15 100
ID01 Set new dryer D-01 (top tier)MILL 2026-08-17 → 2026-08-172026-08-17 100
ID02 Set new dryer D-02 (bottom tier)MILL 2026-08-17 → 2026-08-172026-08-17 100
IB01 Install blow box BB-1MILL 2026-08-18 → 2026-08-182026-08-18 100
ID03 Set new dryer D-03 (top tier)MILL 2026-08-18 → 2026-08-182026-08-18 100
ID04 Set new dryer D-04 (bottom tier)MILL 2026-08-18 → 2026-08-182026-08-18 100
IF01 Install felt roll FR-01 (top felt)MILL 2026-08-18 → 2026-08-182026-08-18 100
IG01 Install bull gear BG-01 and idler gears IG-01, IG-02MILL 2026-08-18 → 2026-08-182026-08-18 100
IG02 Install bull gear BG-02 and idler gears IG-03, IG-04MILL 2026-08-18 → 2026-08-182026-08-18 100
ID05 Set new dryer D-05 (top tier)MILL 2026-08-19 → 2026-08-192026-08-19 100
ID06 Set new dryer D-06 (bottom tier)MILL 2026-08-19 → 2026-08-192026-08-19 100
IG03 Install bull gear BG-03 and idler gears IG-05, IG-06MILL 2026-08-19 → 2026-08-192026-08-19 100
IG04 Install bull gear BG-04 and idler gears IG-07, IG-08MILL 2026-08-19 → 2026-08-192026-08-19 100
ID07 Set new dryer D-07 (top tier)MILL 2026-08-20 → 2026-08-202026-08-20 100
ID08 Set new dryer D-08 (bottom tier)MILL 2026-08-20 → 2026-08-202026-08-20 100
IG05 Install bull gear BG-05 and idler gears IG-09, IG-10MILL 2026-08-20 → 2026-08-202026-08-20 100
IG06 Install bull gear BG-06 and idler gears IG-11, IG-12MILL 2026-08-20 → 2026-08-202026-08-20 100
ID09 Set new dryer D-09 (top tier)MILL 2026-08-21 → 2026-08-212026-08-21 100
ID10 Set new dryer D-10 (bottom tier)MILL 2026-08-21 → 2026-08-212026-08-21 100
IG07 Install bull gear BG-07 and idler gears IG-13, IG-14MILL 2026-08-21 → 2026-08-212026-08-21 100
IG08 Install bull gear BG-08 and idler gears IG-15, IG-16MILL 2026-08-21 → 2026-08-212026-08-21 100
ID11 Set new dryer D-11 (top tier)MILL 2026-08-22 → 2026-08-222026-08-22 100
ID12 Set new dryer D-12 (bottom tier)MILL 2026-08-22 → 2026-08-222026-08-22 100
IF08 Install felt roll FR-08 (bottom felt)MILL 2026-08-22 → 2026-08-222026-08-22 100
IG09 Install bull gear BG-09 and idler gears IG-17, IG-18MILL 2026-08-22 → 2026-08-222026-08-22 100
IG10 Install bull gear BG-10 and idler gears IG-19, IG-20MILL 2026-08-22 → 2026-08-222026-08-22 100
ID13 Set new dryer D-13 (top tier)MILL 2026-08-23 → 2026-08-232026-08-23 100
ID14 Set new dryer D-14 (bottom tier)MILL 2026-08-23 → 2026-08-232026-08-23 100
IF09 Install felt roll FR-09 (bottom felt)MILL 2026-08-23 → 2026-08-232026-08-23 100
IG11 Install bull gear BG-11 and idler gears IG-21, IG-22MILL 2026-08-23 → 2026-08-232026-08-23 100
IG12 Install bull gear BG-12 and idler gears IG-23, IG-24MILL 2026-08-23 → 2026-08-232026-08-23 100
IB02 Install blow box BB-2MILL 2026-08-24 → 2026-08-242026-08-24 100
IF02 Install felt roll FR-02 (top felt)MILL 2026-08-24 → 2026-08-242026-08-24 100
IF10 Install felt roll FR-10 (bottom felt)MILL 2026-08-24 → 2026-08-242026-08-24 100
IG13 Install bull gear BG-13 and idler gears IG-25, IG-26MILL 2026-08-24 → 2026-08-242026-08-24 100
IG14 Install bull gear BG-14 and idler gear IG-27MILL 2026-08-24 → 2026-08-242026-08-24 100
IB03 Install blow box BB-3MILL 2026-08-25 → 2026-08-252026-08-25 100
IF03 Install felt roll FR-03 (top felt)MILL 2026-08-25 → 2026-08-252026-08-25 100
IF11 Install felt roll FR-11 (bottom felt)MILL 2026-08-25 → 2026-08-252026-08-25 100
SY050 Gear mesh, backlash and runout checksMILL 2026-08-25 → 2026-08-262026-08-26 100
IB04 Install blow box BB-4MILL 2026-08-26 → 2026-08-262026-08-26 100
IF04 Install felt roll FR-04 (top felt)MILL 2026-08-26 → 2026-08-262026-08-26 100
IF12 Install felt roll FR-12 (bottom felt)MILL 2026-08-26 → 2026-08-262026-08-26 100
IB05 Install blow box BB-5MILL 2026-08-27 → 2026-08-272026-08-27 100
IF05 Install felt roll FR-05 (top felt)MILL 2026-08-27 → 2026-08-272026-08-27 100
IF13 Install felt roll FR-13 (bottom felt)MILL 2026-08-27 → 2026-08-272026-08-27 100
IB06 Install blow box BB-6MILL 2026-08-28 → 2026-08-282026-08-28 100
IF06 Install felt roll FR-06 (top felt)MILL 2026-08-28 → 2026-08-282026-08-28 100
IF07 Install felt roll FR-07 (top felt)MILL 2026-08-29 → 2026-08-302026-08-30 100
SU030 Hang new press and dryer feltsMILL 2026-09-07 → 2026-09-072026-09-07 100