SAMPLE PROJECT · Completed job · Invented data, read-only · Back to xpcspine.com
XPC Spine PM3-REBUILDPaper Machine 3 Press and Dryer Section Rebuild
Help

Drawings and documents ?

Only the current revision of each drawing and document is shown here, so the field always works to the latest sheet. When a new revision is loaded, the one it replaces moves to the PM's superseded vault.

Superseded revisions (PM only)

Current revisions

NumberTitleRevKindTradeLoadedBy
C-3700-01Press sole plate grout detail
As-built: field changes incorporated
AB 2 older DrawingCONC2026-09-26Document Controller Open
CX-4000-01Startup, dry run and steam-up procedure
Reissued for construction
1 1 older ProcedureCOMM2026-08-09Document Controller Open
E-3400-01Dryer section drive one-line
As-built: field changes incorporated
AB 2 older DrawingEI2026-09-27Document Controller Open
E-3410-01Instrument loop diagrams, dryer section
As-built: field changes incorporated
AB 1 older DrawingEI2026-09-22Document Controller Open
IN-3600-01Insulation details, steam and condensate
As-built: field changes incorporated
AB 1 older DrawingINSUL2026-09-25Document Controller Open
M-3100-01Dryer section general arrangement
As-built: field changes incorporated
AB 2 older DrawingMILL2026-09-22Document Controller Open
M-3110-01Dryer bearing housing and journal details
As-built: field changes incorporated
AB 1 older DrawingMILL2026-09-23Document Controller Open
M-3120-01Gear train layout, bull and idler gears
As-built: field changes incorporated
AB 2 older DrawingMILL2026-09-24Document Controller Open
M-3130-01Felt run layout, top and bottom felts
As-built: field changes incorporated
AB 1 older DrawingMILL2026-09-25Document Controller Open
M-3140-02Blow box arrangement and supply ducts
As-built: field changes incorporated
AB 1 older DrawingMILL2026-09-26Document Controller Open
MB-3900-01Line bore and sleeve procedure, IB-1 to IB-5
Issued for construction
C ProcedureMECH2026-08-09Document Controller Open
MB-3900-02Idler bore sleeve detail
As-built: field changes incorporated
AB 1 older DrawingMECH2026-09-24Document Controller Open
MB-RPT-01Line bore report, IB-1 to IB-5
Issued for turnover
0 OtherMECH2026-09-26Document Controller Open
P-3300-ISO-01Steam joint and syphon isometric, D-01 to D-07
As-built: field changes incorporated
AB 1 older DrawingPIPE2026-09-23Document Controller Open
P-3300-ISO-02Steam joint and syphon isometric, D-08 to D-14
As-built: field changes incorporated
AB 1 older DrawingPIPE2026-09-24Document Controller Open
P-3300-ISO-05Condensate header replacement (CO-001)
As-built: field changes incorporated
AB 1 older DrawingPIPE2026-09-25Document Controller Open
P-PID-330Dryer steam and condensate P&ID
As-built: field changes incorporated
AB 1 older DrawingPIPE2026-09-26Document Controller Open
PM-CLOSE-01Final cost report and lessons learned
Issued for turnover
0 OtherPMGT2026-10-07Document Controller Open
PM-OUT-01Outage execution plan
Issued for construction
3 ProcedurePMGT2026-08-09Document Controller Open
PM-OUT-02Outage lift and crane plan summary
Issued for construction
2 ProcedurePMGT2026-08-09Document Controller Open
QA-ITP-01Inspection and test plan, mechanical install
Issued for construction
2 ProcedureQAQC2026-08-09Document Controller Open
QA-ITP-02Hydro test procedure, dryers and steam joints
Issued for construction
1 ProcedureQAQC2026-08-09Document Controller Open
QA-RPT-01Hydro test and inspection records, dryers and steam joints
Issued for turnover
0 OtherQAQC2026-09-19Document Controller Open
RIG-3200-01Mobile crane set-up, north pad and roof hatch
As-built: field changes incorporated
AB 2 older DrawingRIG2026-09-27Document Controller Open
RIG-3200-02Machine room crane rigging arrangement, dryers
As-built: field changes incorporated
AB 1 older DrawingRIG2026-09-22Document Controller Open
S-3500-01Outage scaffold layout, tending side
As-built: field changes incorporated
AB 1 older DrawingSCAF2026-09-23Document Controller Open
S-3500-02Outage scaffold layout, drive side and gear case
As-built: field changes incorporated
AB 1 older DrawingSCAF2026-09-24Document Controller Open
SV-3800-01Machine centerline and survey control
As-built: field changes incorporated
AB 1 older DrawingSURV2026-09-27Document Controller Open
SV-3800-02Frame survey after removal
As-built: field changes incorporated
AB 1 older DrawingSURV2026-09-22Document Controller Open
SV-RPT-01Final alignment survey report, press and dryers
Issued for turnover
0 OtherSURV2026-09-23Document Controller Open
TO-PKG-01Turnover package index, PM3 rebuild
Issued for turnover
0 OtherPMGT2026-09-21Document Controller Open
Source: doc_file (current revisions only)

Receive a transmittal

Load every drawing on the transmittal at once. Each one goes to its own trade's board, so nobody digs through the whole pile. Name files like M-101_RevB_Felt roll bracket.pdf, or add the transmittal's drawing list.

Routing rules

Drawings already on the drawing register go to that trade. A rule sends every number that starts a certain way to one trade, for example M-2 to Millwright.

Load a drawing or a new revision