XPC Spine PM3-REBUILDPaper Machine 3 Press and Dryer Section Rebuild
Help

Millwrights ?

Trade lead: Dale Whitaker, Northfield Millwright Services · Everything saved here shows live on the PM and CM screens.

Owner: Millwright Lead · Readers: Construction Manager, Project Manager · Trades: MILL · Foreman view · Enter on this board

Is this page current? All feeds OK

CM look-ahead OK 3 h ago · expected every 24 h
Contractor daily logs OK 71 min ago · expected every 24 h
Cost report OK 9 h ago · expected every 7 d
Doc control drawings OK 51 min ago · expected every 24 h
Meeting records OK 22 h ago · expected every 7 d
Procurement register OK 26 h ago · expected every 7 d
Schedule (P6 export) OK 41 min ago · expected every 24 h
Watch list register OK 21 min ago · expected every 24 h
Late activities
0
Planned finish before today, no actual finish
Source: activity
Due in 7 days
0
Planned finish in the next 7 days
Source: activity
Percent complete calculated
100%
Source: activity · inputs: activity.pct_complete (simple average)
Cost performance (CPI) calculated
0.99
Cost performance index: earned value / actual cost
Source: cost_account · inputs: cost_account.budget, cost_account.actual, activity.pct_complete
Drawings current
5 / 5
Sheets held at the revision doc control holds
Source: drawing

Exceptions requiring attention

Nothing past its needed-by date.

Source: watch_item

Watch list profile

Source: watch_item

Delays on this trade

No open delays on this trade.

Source: delay, schedule_slip

Changes and back-charges

Budget $3,250,200 · approved changes $79,900 · revised $3,330,100 · pending $0 · back-charges open $0 · value returned $0

No pending change orders or open back-charges.

Source: cost_account, change_order, backcharge

From front-end loading

No open front-end findings on this trade.

Source: fel_finding, activity, schedule_slip, delay, material_item, missed_date

From meetings

DECISION Millwrights set BB-2 on its supports and carry on with BB-3 to BB-6 (IB03); bolt-up when the adapter arrives. in decision register · Daily Outage Coordination, day 18 2026-08-22, line 10

ACTION Dale Whitaker to chase the BB-2 adapter flange with the blow box supplier by 2026-08-23. watch item MTG-3-21 · Daily Outage Coordination, day 18 2026-08-22, line 14

DATE All 14 dryers set by 2026-08-23 (ID14). watch item MTG-2-17 · Weekly Outage Coordination, day 11 2026-08-15, line 21

Source: meeting, meeting_item

Next shifts

ActivityAreaContractorPlanned%
Source: activity

Crane sequence

No lifts in the next 7 days.

Source: activity

Drawings

NumberTitleHeldDoc controlStatus
M-3100-01Dryer section general arrangement ABAB CURRENT
M-3110-01Dryer bearing housing and journal details ABAB CURRENT
M-3120-01Gear train layout, bull and idler gears ABAB CURRENT
M-3130-01Felt run layout, top and bottom felts ABAB CURRENT
M-3140-02Blow box arrangement and supply ducts ABAB CURRENT
Source: drawing

Prints for this trade ?

Current revisions only, filed by trade as they are received. Older revisions are kept by the PM.

NumberTitleRevTradeReceived
M-3100-01Dryer section general arrangementAB MILL2026-09-22Open
M-3110-01Dryer bearing housing and journal detailsAB MILL2026-09-23Open
M-3120-01Gear train layout, bull and idler gearsAB MILL2026-09-24Open
M-3130-01Felt run layout, top and bottom feltsAB MILL2026-09-25Open
M-3140-02Blow box arrangement and supply ductsAB MILL2026-09-26Open
Source: doc_file (current revisions)

Photos: progress and evidence

No photo yet

No photos yet. Use Take a photo on a phone or tablet to open the camera.

Source: board_photo · each photo keeps who took it, when, and a SHA-256 fingerprint

Milestones

No milestones for this trade.

Source: activity

Budget and earned value calculated

AccountWBSBudgetEarnedActualForecast
MILL-2.1-A902.1 · A90$383,900$383,900$387,000$387,000
MILL-3.5-A803.5 · A80$204,700$204,700$206,300$206,300
MILL-4.1-A804.1 · A80$128,000$128,000$129,000$129,000
MILL-5.1-A205.1 · A20$51,200$51,200$51,600$51,600
MILL-5.3-A205.3 · A20$332,700$332,700$335,400$335,400
MILL-5.4-A205.4 · A20$153,500$153,500$154,700$154,700
MILL-5.5-A305.5 · A30$358,300$358,300$361,200$361,200
MILL-5.6-A205.6 · A20$358,300$358,300$361,200$361,200
MILL-7.2-A207.2 · A20$358,300$358,300$361,200$361,200
MILL-7.3-A307.3 · A30$358,300$358,300$361,200$361,200
MILL-7.4-A207.4 · A20$370,900$370,900$373,900$373,900
MILL-7.5-A207.5 · A20$195,200$195,200$196,800$196,800
MILL-8.3-A308.3 · A30$51,200$51,200$51,600$51,600
MILL-9-A209 · A20$25,600$25,600$25,800$25,800
Source: cost_account, activity · Earned = budget × average percent complete of activities on the same WBS, area and trade

Manpower and daily logs

DateContractorLogHeadcountCrew hours
2026-10-22Northfield Millwright Services read 00.0
2026-10-21Northfield Millwright Services read 00.0
2026-10-20Northfield Millwright Services read 00.0
2026-10-19Northfield Millwright Services read 00.0
2026-10-18Northfield Millwright Services read 00.0
2026-10-17Northfield Millwright Services read 00.0
2026-10-16Northfield Millwright Services read 00.0
Hours per task are MISSING: contractor logs do not carry them
Source: daily_log

Shift turnover

2026-08-28 NIGHTS AGREE
Lead: BB-6 set and bolted
Contractor: Blow boxes complete
2026-08-24 DAYS AGREE
Lead: D-13, D-14 set; IG-25 to IG-27 installed
Contractor: Dryer install complete
2026-08-23 NIGHTS awaiting lead
Lead: D-13/D-14 rigging laid out, gears BG-11/BG-12 staged
Contractor: Dryers D-13, D-14 started
2026-08-22 DAYS DISAGREE
Lead: D-11 and D-12 set; BB-2 on supports, not bolted
Contractor: D-11, D-12, BB-2 complete
2026-08-21 NIGHTS AGREE
Lead: D-09 and D-10 set, housings torqued
Contractor: D-09, D-10 complete
Source: shift_turnover

Field log

No entries.

Source: field_entry

Safety observations

2026-09-21 Final walk with operations: laydown and trailers cleared, no open permits, no recordable injuries on the job. Referred to Site Safety Lead

2026-09-20 Felt hanging crew briefed on nip points before the rolls turned. Referred to Site Safety Lead

2026-09-15 Gear guard left off after the backlash check; refitted before the jog. Referred to Site Safety Lead

2026-09-13 Housekeeping on the operating floor after demob; good. Referred to Site Safety Lead

2026-09-11 Felt hanging crew briefed on nip points before the rolls turned. Referred to Site Safety Lead

Observations only. Referred to the site safety lead.
Source: safety_observation

Enter on this board

Each entry records your name. Changes show on this board, the CM roll-up and the master board straight away.

Watch list: add or change an item
Record a decision
Add a shift turnover
Add a field log entry
Record a safety observation

Observations only. Incidents and injuries go through the site safety process, not this board.

Forms and sign-off cards

  • Shaft alignment record
  • Bearing installation record
  • Run-in sheet
Source: board settings