XPC Spine PM3-REBUILDPaper Machine 3 Press and Dryer Section Rebuild
Help
Procurement Document control Current revisions Safety center

Document control ?

Every drawing on the project, compared with the revision each board holds. Sheets doc control could not read are left for a person to check, never filled in.

Is this page current? All feeds OK

Doc control drawings OK 51 min ago · expected every 24 h

By trade

TradeSheetsCurrentNewer rev waitingNot heldUnreadable
COMM11 00 0
CONC11 00 0
EI22 00 0
INSUL11 00 0
MECH33 00 0
MILL55 00 0
PIPE44 00 0
PMGT44 00 0
QAQC33 00 0
RIG22 00 0
SCAF22 00 0
SURV33 00 0
Source: drawing

Sheets needing action first

NumberTitleTradeFolderBoard holdsDoc controlStatus
C-3700-01Press sole plate grout detailCONCDC/Concrete ABAB CURRENT
CX-4000-01Startup, dry run and steam-up procedureCOMMDC/Commissioning 11 CURRENT
E-3400-01Dryer section drive one-lineEIDC/Electrical and Instrumentation ABAB CURRENT
E-3410-01Instrument loop diagrams, dryer sectionEIDC/Electrical and Instrumentation ABAB CURRENT
IN-3600-01Insulation details, steam and condensateINSULDC/Insulation ABAB CURRENT
M-3100-01Dryer section general arrangementMILLDC/Millwrights ABAB CURRENT
M-3110-01Dryer bearing housing and journal detailsMILLDC/Millwrights ABAB CURRENT
M-3120-01Gear train layout, bull and idler gearsMILLDC/Millwrights ABAB CURRENT
M-3130-01Felt run layout, top and bottom feltsMILLDC/Millwrights ABAB CURRENT
M-3140-02Blow box arrangement and supply ductsMILLDC/Millwrights ABAB CURRENT
MB-3900-01Line bore and sleeve procedure, IB-1 to IB-5MECHDC/Line Boring and Machining CC CURRENT
MB-3900-02Idler bore sleeve detailMECHDC/Line Boring and Machining ABAB CURRENT
MB-RPT-01Line bore report, IB-1 to IB-5MECHDC/Line Boring and Machining 00 CURRENT
P-3300-ISO-01Steam joint and syphon isometric, D-01 to D-07PIPEDC/Piping ABAB CURRENT
P-3300-ISO-02Steam joint and syphon isometric, D-08 to D-14PIPEDC/Piping ABAB CURRENT
P-3300-ISO-05Condensate header replacement (CO-001)PIPEDC/Piping ABAB CURRENT
P-PID-330Dryer steam and condensate P&IDPIPEDC/Piping ABAB CURRENT
PM-CLOSE-01Final cost report and lessons learnedPMGTDC/Project Management and Procurement 00 CURRENT
PM-OUT-01Outage execution planPMGTDC/Project Management and Procurement 33 CURRENT
PM-OUT-02Outage lift and crane plan summaryPMGTDC/Project Management and Procurement 22 CURRENT
QA-ITP-01Inspection and test plan, mechanical installQAQCDC/Welding and QA/QC 22 CURRENT
QA-ITP-02Hydro test procedure, dryers and steam jointsQAQCDC/Welding and QA/QC 11 CURRENT
QA-RPT-01Hydro test and inspection records, dryers and steam jointsQAQCDC/Welding and QA/QC 00 CURRENT
RIG-3200-01Mobile crane set-up, north pad and roof hatchRIGDC/Rigging and Heavy Lift ABAB CURRENT
RIG-3200-02Machine room crane rigging arrangement, dryersRIGDC/Rigging and Heavy Lift ABAB CURRENT
S-3500-01Outage scaffold layout, tending sideSCAFDC/Scaffolding ABAB CURRENT
S-3500-02Outage scaffold layout, drive side and gear caseSCAFDC/Scaffolding ABAB CURRENT
SV-3800-01Machine centerline and survey controlSURVDC/Survey and Layout ABAB CURRENT
SV-3800-02Frame survey after removalSURVDC/Survey and Layout ABAB CURRENT
SV-RPT-01Final alignment survey report, press and dryersSURVDC/Survey and Layout 00 CURRENT
TO-PKG-01Turnover package index, PM3 rebuildPMGTDC/Project Management and Procurement 00 CURRENT