SAMPLE PROJECT · Completed job · Invented data, read-only · Back to xpcspine.com
XPC Spine PM3-REBUILDPaper Machine 3 Press and Dryer Section Rebuild
Help
Gantt and activities Schedule check Working over each other

Working over each other ?

Finds crews from different contractors scheduled in the same area at the same time where one is above the other (6 ft or more apart) or under a crane lift, then re-sequences them using float so the project finish does not move. Each fix is a safety tie: one crew finishes before the other starts in that area.

Stacked crews now calc
0
one above the other or under a lift
Source: activity
Can fix with float calc
0
safety ties that keep the finish
Source: activity, activity_rel
Need a decision
0
no float left to separate them
Source: activity
Project finish
2026-10-21
unchanged by the fixes
Source: activity

Hazards on the current schedule

No crews scheduled over each other.

Re-sequence plan

Nothing to re-sequence.

Work elevations

Feet above datum where each crew works (for example 100 at grade, 135 on the rack). P6 exports carry it in an activity code named Elevation; entries here are kept when a new export loads. Blank means unknown, and unknown overlaps are listed for review.

AreaActivityContractorCraneElevation (ft)