Working over each other
Finds crews from different contractors scheduled in the same area at the same time where one is above the other (6 ft or more apart) or under a crane lift, then re-sequences them using float so the project finish does not move. Each fix is a safety tie: one crew finishes before the other starts in that area.
Stacked crews now calc
0
one above the other or under a lift
Source: activity
Can fix with float calc
0
safety ties that keep the finish
Source: activity, activity_rel
Need a decision
0
no float left to separate them
Source: activity
Project finish
2026-10-21
unchanged by the fixes
Source: activity
Hazards on the current schedule
No crews scheduled over each other.
Re-sequence plan
Nothing to re-sequence.
Work elevations
Feet above datum where each crew works (for example 100 at grade, 135 on the rack). P6 exports carry it in an activity code named Elevation; entries here are kept when a new export loads. Blank means unknown, and unknown overlaps are listed for review.
| Area | Activity | Contractor | Crane | Elevation (ft) |
|---|