Help ›
Procurement and document control
Material against the date the work needs it, and every drawing against the revision each board holds.
Procurement
- Open Management, then Procurement.
- Each PO line is checked against the planned start of the activity that uses it, unless you enter a need-by date.
- Status (late, at risk, no promise, on track, delivered) and margin in days are worked out from the dates.
- Add a material line, or upload the register as CSV. A late or at-risk line can go straight to the delay log with Log as a material delay.
Document control
- Open Management, then Document control. 'Sheets needing action first' is the list to work.
- Upload the doc control drawing list as CSV, or let a SharePoint connector keep it up to date.
- A blank revision means unreadable and is left for the lead to check.