Getting started on a new project

The checklist a PM works through to open a project, from setup to the first client release.

Watch the setup videos Quick overview (3:32) · Full tutorial (13:58), narrated, with captions
Quick overview (3:32) The guided setup in five steps.

Open the video on its own

Full tutorial (13:58) Setup with a P6 schedule, finishing the setup, and a tour for the PM, in chapters.

Open the video on its own

Sample project, invented names · Voice: Piper, LibriTTS dataset (CC BY 4.0)

Projects New project Finish setting up

Getting started: PM3-REBUILD

5 of 14 steps ticked by the platform. Steps without a tick box are for you to check.

  1. ✓ Create the project Basics, project type, trades, contractors and the P6 schedule (New project).
  2. · Check the boards and project details Board owners, readers, contractors and tie-in words. · check it yourself
  3. ✓ Assign a trade lead to every board Pick each trade's lead from the people on the project (PM or CM).
  4. ○ Add people and give them roles PM, CM, superintendent, leads, foremen, contractors, client.
  5. ○ Publish the client's NDA Replace the placeholder text with the client's or counsel's NDA.
  6. ✓ Load the P6 schedule Upload data, Schedule, your .xer export.
  7. ✓ Load the cost report Upload data, Cost report, by WBS, area and trade.
  8. ○ Load the doc control drawing list Upload data, or a SharePoint connector.
  9. ✓ Set a schedule baseline Schedule, Set the current dates as the baseline.
  10. · Check for crews working over each other Fix with safety ties or record overhead protection. · check it yourself
  11. · Set safety training rules Safety, Training and cards: what each role must hold. 14 days' grace. · check it yourself
  12. ○ Set up subcontracts for pay apps Original sum and retainage for each contractor.
  13. ○ Connect P6 or the ERP (optional) Timed pulls instead of uploads. Secrets stay in server settings.
  14. ○ Approve the first client release Progress, milestones and delays, frozen for the client.

How to use the checklist

  1. Open Help from the top of any project page. The checklist is for that project.
  2. Work down the list. Each step links to the page where you do it.
  3. Steps the platform can check tick themselves once the data is in (schedule loaded, leads assigned and so on).
  4. Steps marked 'check it yourself' are judgement calls the platform cannot see.
  5. Right after a project is created you land on Finish setting up: the same checklist, kept to what is left.

Ask the guide

Shows the help topics that match your question.

Other topics

Signing in, two-step and work accounts · Setting up a new project · Trade boards and trade leads · P6 schedule, Gantt and the scheduler · Working over each other · Safety control center · Safety training and OSHA cards · Rigging and lift plans · Meetings · Delay log · Client delay report · Change orders, back-charges and pay apps · Drawings, revisions and board photos · Procurement and document control · Client NDA · Client master board · Live connectors · Live boards · Your scope page (contractors)