Safety control center
Safety comes first on this project. Every pre-task plan, permit, inspection, corrective action, incident, stop-work and toolbox talk is recorded here with who entered it. Anyone may stop work. Safety reports stay open to every field supervisor at all times.
Observations, last 30 days
0
Source: safety_observation
Safety observations
Observations entered on every trade board, newest first, with who each was referred to. Raise a corrective action for anything that needs fixing.
| Date | Trade | Observation | Referred to | Recorded |
|---|---|---|---|---|
| 2026-09-21 | MILL | Final walk with operations: laydown and trailers cleared, no open permits, no recordable injuries on the job. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-21 | COMM | Steam-up walk-down: all vents and drains confirmed with operations. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-20 | MILL | Felt hanging crew briefed on nip points before the rolls turned. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-19 | INSUL | Insulation crew wearing gloves and sleeves with mineral wool; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-18 | SCAF | Scaffold strike: tools lanyarded, area below barricaded. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-17 | EI | Every drive locked and tried before the coupling work; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-16 | PIPE | Hydro test boundary barricaded and signed; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-15 | MILL | Gear guard left off after the backlash check; refitted before the jog. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-14 | RIG | Outrigger mats re-checked after rain before the press roll picks; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-13 | MILL | Housekeeping on the operating floor after demob; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-12 | QAQC | Punch walk party kept to the marked walkway with operations running. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-11 | COMM | Steam-up walk-down: all vents and drains confirmed with operations. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-11 | MILL | Felt hanging crew briefed on nip points before the rolls turned. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-10 | INSUL | Insulation crew wearing gloves and sleeves with mineral wool; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-10 | SCAF | Scaffold strike: tools lanyarded, area below barricaded. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-09 | EI | Every drive locked and tried before the coupling work; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-09 | PIPE | Hydro test boundary barricaded and signed; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-08 | MILL | Gear guard left off after the backlash check; refitted before the jog. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-08 | RIG | Outrigger mats re-checked after rain before the press roll picks; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-07 | MILL | Housekeeping on the operating floor after demob; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-07 | QAQC | Punch walk party kept to the marked walkway with operations running. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-06 | COMM | Steam-up walk-down: all vents and drains confirmed with operations. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-06 | MILL | Felt hanging crew briefed on nip points before the rolls turned. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-05 | INSUL | Insulation crew wearing gloves and sleeves with mineral wool; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-05 | SCAF | Scaffold strike: tools lanyarded, area below barricaded. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-04 | EI | Every drive locked and tried before the coupling work; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-04 | PIPE | Hydro test boundary barricaded and signed; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-03 | MILL | Gear guard left off after the backlash check; refitted before the jog. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-03 | RIG | Outrigger mats re-checked after rain before the press roll picks; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-02 | MILL | Housekeeping on the operating floor after demob; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-02 | QAQC | Punch walk party kept to the marked walkway with operations running. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-01 | COMM | Steam-up walk-down: all vents and drains confirmed with operations. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-09-01 | MILL | Felt hanging crew briefed on nip points before the rolls turned. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-31 | INSUL | Insulation crew wearing gloves and sleeves with mineral wool; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-31 | SCAF | Scaffold strike: tools lanyarded, area below barricaded. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-30 | EI | Every drive locked and tried before the coupling work; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-30 | PIPE | Hydro test boundary barricaded and signed; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-29 | MILL | Gear guard left off after the backlash check; refitted before the jog. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-29 | RIG | Outrigger mats re-checked after rain before the press roll picks; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-28 | MILL | Housekeeping on the operating floor after demob; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-28 | QAQC | Punch walk party kept to the marked walkway with operations running. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-27 | COMM | Steam-up walk-down: all vents and drains confirmed with operations. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-27 | MILL | Felt hanging crew briefed on nip points before the rolls turned. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-26 | INSUL | Insulation crew wearing gloves and sleeves with mineral wool; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-26 | SCAF | Scaffold strike: tools lanyarded, area below barricaded. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-25 | EI | Every drive locked and tried before the coupling work; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-25 | PIPE | Hydro test boundary barricaded and signed; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-24 | MILL | Gear guard left off after the backlash check; refitted before the jog. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-24 | RIG | Outrigger mats re-checked after rain before the press roll picks; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-23 | SCAF | Scaffold tag on drive-side bay 3 not signed for the night shift. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-23 | RIG | Rigger inspected slings and shackles before the shift and tagged one sling out of service. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-22 | MILL | Good catch: crew stopped a dryer pick when the tag line handler stepped into the swing path. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-22 | EI | Temporary power cord across the basement walkway; rerouted overhead. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-21 | RIG | Wind checked before the 250 t crane pick and logged on the lift plan. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-21 | CONC | Epoxy grout mixing with face shields and gloves per the SDS; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-20 | MILL | Unlabelled oil drum near the lube skid; labelled and moved to the bunded store. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-20 | SURV | Survey crew wore harnesses tied off at 132 ft on the top-tier dryers. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-19 | PIPE | Line break permit posted at the flange with the drain verified; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-19 | SCAF | Toe boards missing on one top-tier platform bay; fitted before work started. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-18 | MILL | Gear case platform kept clear of tools; good housekeeping. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-18 | RIG | Barricade gap in the tending aisle under the crane path; closed at once. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-17 | MECH | Boring bar guard in place, area roped off, chips cleaned up at shift change. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-17 | EI | Lockout box tagged correctly; every worker on the drive side had a personal lock on. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-16 | MILL | Hand placement on the spreader beam during landing: worker reminded to keep hands off pinch points. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-16 | PIPE | Fire watch stayed 60 min after hot work on the condensate header; good practice. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-15 | SCAF | Scaffold tag on drive-side bay 3 not signed for the night shift. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-15 | RIG | Rigger inspected slings and shackles before the shift and tagged one sling out of service. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-14 | MILL | Good catch: crew stopped a dryer pick when the tag line handler stepped into the swing path. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-14 | EI | Temporary power cord across the basement walkway; rerouted overhead. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-13 | RIG | Wind checked before the 250 t crane pick and logged on the lift plan. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-13 | CONC | Epoxy grout mixing with face shields and gloves per the SDS; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-12 | MILL | Unlabelled oil drum near the lube skid; labelled and moved to the bunded store. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-12 | SURV | Survey crew wore harnesses tied off at 132 ft on the top-tier dryers. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-11 | PIPE | Line break permit posted at the flange with the drain verified; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-11 | SCAF | Toe boards missing on one top-tier platform bay; fitted before work started. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-10 | MILL | Gear case platform kept clear of tools; good housekeeping. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-10 | RIG | Barricade gap in the tending aisle under the crane path; closed at once. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-09 | MECH | Boring bar guard in place, area roped off, chips cleaned up at shift change. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-09 | EI | Lockout box tagged correctly; every worker on the drive side had a personal lock on. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-08 | MILL | Hand placement on the spreader beam during landing: worker reminded to keep hands off pinch points. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-08 | PIPE | Fire watch stayed 60 min after hot work on the condensate header; good practice. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-07 | SCAF | Scaffold tag on drive-side bay 3 not signed for the night shift. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-07 | RIG | Rigger inspected slings and shackles before the shift and tagged one sling out of service. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-06 | MILL | Good catch: crew stopped a dryer pick when the tag line handler stepped into the swing path. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-06 | EI | Temporary power cord across the basement walkway; rerouted overhead. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-05 | RIG | Wind checked before the 250 t crane pick and logged on the lift plan. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-05 | CONC | Epoxy grout mixing with face shields and gloves per the SDS; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-04 | MILL | Unlabelled oil drum near the lube skid; labelled and moved to the bunded store. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-04 | SURV | Survey crew wore harnesses tied off at 132 ft on the top-tier dryers. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-03 | PIPE | Line break permit posted at the flange with the drain verified; good. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-02 | SCAF | Toe boards missing on one top-tier platform bay; fitted before work started. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-08-01 | MILL | Gear case platform kept clear of tools; good housekeeping. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-31 | RIG | Barricade gap in the tending aisle under the crane path; closed at once. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-30 | MECH | Boring bar guard in place, area roped off, chips cleaned up at shift change. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-29 | EI | Lockout box tagged correctly; every worker on the drive side had a personal lock on. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-28 | MILL | Hand placement on the spreader beam during landing: worker reminded to keep hands off pinch points. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-27 | PIPE | Fire watch stayed 60 min after hot work on the condensate header; good practice. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-26 | SCAF | Scaffold tag on drive-side bay 3 not signed for the night shift. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-25 | RIG | Rigger inspected slings and shackles before the shift and tagged one sling out of service. | Site Safety Lead | entered on the board by Site Safety Lead |
| 2026-07-24 | MILL | Good catch: crew stopped a dryer pick when the tag line handler stepped into the swing path. | Site Safety Lead | entered on the board by Site Safety Lead |
Source: safety_observation