XPC Spine PM3-REBUILDPaper Machine 3 Press and Dryer Section Rebuild
Help
OverviewPre-task plansPermitsInspectionsCorrective actionsIncidents and near missesStop workToolbox talksObservationsTraining and cardsLift plans

Safety control center ?

Safety comes first on this project. Every pre-task plan, permit, inspection, corrective action, incident, stop-work and toolbox talk is recorded here with who entered it. Anyone may stop work. Safety reports stay open to every field supervisor at all times.

Anyone may stop work they believe is unsafe, without penalty. Record it here. Work restarts only when a PM, construction manager or superintendent releases it with what was fixed.

Stop-work log

RefDateTradeWhyStopped byReleased
SW-0012026-08-18PIPE
Basement, drive side
Residual condensate at a flange: line breaks stopped until every low point is drained and verifiedMarcus Lee
recorded by Marcus Lee
2026-08-18 by Carl Mendez, Superintendent
Low points drained and verified at zero; line break permit updated with a drain-and-verify step
Source: safety_stop_work

Record a stop-work