Rigging and lift plans ?

Every lift by equipment tag: the item weight and where it came from, the rigging by tag, the crane and set-up, and the people running it. The platform adds the rigging and hook block to the item weight, reads the load chart at the planned radius, and checks every sling and shackle against what it will carry. Over 75% of chart, a tandem pick or a load over people makes it a critical lift. These numbers are a cross-check; the crane chart, rigging ratings and the qualified lift director's sign-off govern the lift.

Lift plans
162
0 approved · 0 draft · 162 made
Source: lift_plan
Critical lifts calc
2
over 75% of chart, tandem, or over people
Source: lift_plan, lift_chart
Plans with a failed check calc
0
cannot be approved until fixed
Source: lift_plan, rigging_gear
Heaviest lift calc
78,456 lb
ID14-1 D-14N, 65.4% of chart
Source: lift_plan
Total lifted calc
1,618 tons
item weights, all plans
Source: lift_plan

Lift register

LiftItem tagWhatActivity and dateCrane and set-upItem lbRigging + block lbGross lb% of chartSling load / legStatus
RM010-1 PR-SPU Remove suction pick-up roll to the laydown
From the drawing
RM010 06-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 74 ft radius
38,400 11,050 49,450 42.6% 19,200
2 legs at 90°
DONE
RM010-2 PR-1T Remove 1st press top roll to the laydown
From the drawing
RM010 06-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 80 ft radius
52,600 11,050 63,650 54.9% 26,300
2 legs at 90°
DONE
RM010-3 PR-SP Remove suction press roll to the laydown
From the drawing
RM010 06-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 92 ft radius
61,200 11,050 72,250 87% 30,600
2 legs at 90°
DONE CRITICAL LIFT
RM010-4 PR-2T Remove 2nd press top roll to the laydown
From the drawing
RM010 06-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 82 ft radius
47,900 11,050 58,950 60.2% 23,950
2 legs at 90°
DONE
RM010-5 PR-2B Remove 2nd press bottom roll to the laydown
From the drawing
RM010 06-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 86 ft radius
44,300 11,050 55,350 56.5% 22,150
2 legs at 90°
DONE
RG01-1 BG-01 Remove bull gear BG-01
From the drawing
RG01 07-Aug-26 Gear case hoist (10t) 6,897 360 7,257 36.3% 3,982
2 legs at 60°
DONE
RG01-2 IG-01 Remove idler gear IG-01
From the drawing
RG01 07-Aug-26 Gear case hoist (10t) 1,531 360 1,891 9.5% 884
2 legs at 60°
DONE
RG01-3 IG-02 Remove idler gear IG-02
From the drawing
RG01 07-Aug-26 Gear case hoist (10t) 1,662 360 2,022 10.1% 960
2 legs at 60°
DONE
RG02-1 BG-02 Remove bull gear BG-02
From the drawing
RG02 07-Aug-26 Gear case hoist (10t) 6,994 360 7,354 36.8% 4,038
2 legs at 60°
DONE
RG02-2 IG-03 Remove idler gear IG-03
From the drawing
RG02 07-Aug-26 Gear case hoist (10t) 1,793 360 2,153 10.8% 1,035
2 legs at 60°
DONE
RG02-3 IG-04 Remove idler gear IG-04
From the drawing
RG02 07-Aug-26 Gear case hoist (10t) 1,924 360 2,284 11.4% 1,111
2 legs at 60°
DONE
RB01-1 BB-1 Remove blow box BB-1
From the drawing
RB01 08-Aug-26 Machine room crane (60t) 2,740 2,522 5,262 4.4% 1,582
2 legs at 60°
DONE
RB02-1 BB-2 Remove blow box BB-2
From the drawing
RB02 08-Aug-26 Machine room crane (60t) 2,880 2,522 5,402 4.5% 1,663
2 legs at 60°
DONE
RB03-1 BB-3 Remove blow box BB-3
From the drawing
RB03 08-Aug-26 Machine room crane (60t) 3,020 2,522 5,542 4.6% 1,744
2 legs at 60°
DONE
RB04-1 BB-4 Remove blow box BB-4
From the drawing
RB04 08-Aug-26 Machine room crane (60t) 3,160 2,522 5,682 4.7% 1,824
2 legs at 60°
DONE
RB05-1 BB-5 Remove blow box BB-5
From the drawing
RB05 08-Aug-26 Machine room crane (60t) 3,300 2,522 5,822 4.9% 1,905
2 legs at 60°
DONE
RB06-1 BB-6 Remove blow box BB-6
From the drawing
RB06 08-Aug-26 Machine room crane (60t) 3,440 2,522 5,962 5% 1,986
2 legs at 60°
DONE
RF01-1 FR-01 Remove felt roll FR-01 (top felt)
From the drawing
RF01 08-Aug-26 Machine room crane (60t) 10,173 3,668 13,841 11.5% 5,873
2 legs at 60°
DONE
RF02-1 FR-02 Remove felt roll FR-02 (top felt)
From the drawing
RF02 08-Aug-26 Machine room crane (60t) 10,546 3,668 14,214 11.8% 6,089
2 legs at 60°
DONE
RF03-1 FR-03 Remove felt roll FR-03 (top felt)
From the drawing
RF03 08-Aug-26 Machine room crane (60t) 10,919 3,668 14,587 12.2% 6,304
2 legs at 60°
DONE
RF04-1 FR-04 Remove felt roll FR-04 (top felt)
From the drawing
RF04 08-Aug-26 Machine room crane (60t) 11,292 3,668 14,960 12.5% 6,519
2 legs at 60°
DONE
RF05-1 FR-05 Remove felt roll FR-05 (top felt)
From the drawing
RF05 08-Aug-26 Machine room crane (60t) 11,665 3,668 15,333 12.8% 6,735
2 legs at 60°
DONE
RF06-1 FR-06 Remove felt roll FR-06 (top felt)
From the drawing
RF06 08-Aug-26 Machine room crane (60t) 12,038 3,668 15,706 13.1% 6,950
2 legs at 60°
DONE
RF07-1 FR-07 Remove felt roll FR-07 (top felt)
From the drawing
RF07 08-Aug-26 Machine room crane (60t) 12,411 3,668 16,079 13.4% 7,165
2 legs at 60°
DONE
RF08-1 FR-08 Remove felt roll FR-08 (bottom felt)
From the drawing
RF08 08-Aug-26 Machine room crane (60t) 12,784 3,668 16,452 13.7% 7,381
2 legs at 60°
DONE
RF09-1 FR-09 Remove felt roll FR-09 (bottom felt)
From the drawing
RF09 08-Aug-26 Machine room crane (60t) 13,157 3,668 16,825 14% 7,596
2 legs at 60°
DONE
RF10-1 FR-10 Remove felt roll FR-10 (bottom felt)
From the drawing
RF10 08-Aug-26 Machine room crane (60t) 13,530 3,668 17,198 14.3% 7,812
2 legs at 60°
DONE
RF11-1 FR-11 Remove felt roll FR-11 (bottom felt)
From the drawing
RF11 08-Aug-26 Machine room crane (60t) 13,903 3,668 17,571 14.6% 8,027
2 legs at 60°
DONE
RF12-1 FR-12 Remove felt roll FR-12 (bottom felt)
From the drawing
RF12 08-Aug-26 Machine room crane (60t) 14,276 3,668 17,944 15% 8,242
2 legs at 60°
DONE
RF13-1 FR-13 Remove felt roll FR-13 (bottom felt)
From the drawing
RF13 08-Aug-26 Machine room crane (60t) 9,849 3,668 13,517 11.3% 5,686
2 legs at 60°
DONE
RG03-1 BG-03 Remove bull gear BG-03
From the drawing
RG03 08-Aug-26 Gear case hoist (10t) 7,091 360 7,451 37.3% 4,094
2 legs at 60°
DONE
RG03-2 IG-05 Remove idler gear IG-05
From the drawing
RG03 08-Aug-26 Gear case hoist (10t) 2,055 360 2,415 12.1% 1,186
2 legs at 60°
DONE
RG03-3 IG-06 Remove idler gear IG-06
From the drawing
RG03 08-Aug-26 Gear case hoist (10t) 2,186 360 2,546 12.7% 1,262
2 legs at 60°
DONE
RG04-1 BG-04 Remove bull gear BG-04
From the drawing
RG04 08-Aug-26 Gear case hoist (10t) 7,188 360 7,548 37.7% 4,150
2 legs at 60°
DONE
RG04-2 IG-07 Remove idler gear IG-07
From the drawing
RG04 08-Aug-26 Gear case hoist (10t) 2,317 360 2,677 13.4% 1,338
2 legs at 60°
DONE
RG04-3 IG-08 Remove idler gear IG-08
From the drawing
RG04 08-Aug-26 Gear case hoist (10t) 2,448 360 2,808 14% 1,413
2 legs at 60°
DONE
RD01-1 D-01 Remove dryer D-01 (top tier)
From the drawing
RD01 09-Aug-26 Machine room crane (60t) 66,389 6,310 72,699 60.6% 33,194
2 legs at 90°
DONE
RD02-1 D-02 Remove dryer D-02 (bottom tier)
From the drawing
RD02 09-Aug-26 Machine room crane (60t) 66,778 6,310 73,088 60.9% 33,389
2 legs at 90°
DONE
RG05-1 BG-05 Remove bull gear BG-05
From the drawing
RG05 09-Aug-26 Gear case hoist (10t) 7,285 360 7,645 38.2% 4,206
2 legs at 60°
DONE
RG05-2 IG-09 Remove idler gear IG-09
From the drawing
RG05 09-Aug-26 Gear case hoist (10t) 2,579 360 2,939 14.7% 1,489
2 legs at 60°
DONE
RG05-3 IG-10 Remove idler gear IG-10
From the drawing
RG05 09-Aug-26 Gear case hoist (10t) 2,710 360 3,070 15.3% 1,565
2 legs at 60°
DONE
RG06-1 BG-06 Remove bull gear BG-06
From the drawing
RG06 09-Aug-26 Gear case hoist (10t) 7,382 360 7,742 38.7% 4,262
2 legs at 60°
DONE
RG06-2 IG-11 Remove idler gear IG-11
From the drawing
RG06 09-Aug-26 Gear case hoist (10t) 2,841 360 3,201 16% 1,640
2 legs at 60°
DONE
RG06-3 IG-12 Remove idler gear IG-12
From the drawing
RG06 09-Aug-26 Gear case hoist (10t) 1,472 360 1,832 9.2% 850
2 legs at 60°
DONE
RM020-1 PF-TS Remove tending-side press frame
From the drawing
RM020 09-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 78 ft radius
28,700 5,300 34,000 29.3% 16,570
2 legs at 60°
DONE
RM020-2 PF-DS Remove drive-side press frame
From the drawing
RM020 09-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 84 ft radius
31,400 5,300 36,700 37.4% 18,129
2 legs at 60°
DONE
RD03-1 D-03 Remove dryer D-03 (top tier)
From the drawing
RD03 10-Aug-26 Machine room crane (60t) 67,167 6,310 73,477 61.2% 33,584
2 legs at 90°
DONE
RD04-1 D-04 Remove dryer D-04 (bottom tier)
From the drawing
RD04 10-Aug-26 Machine room crane (60t) 67,556 6,310 73,866 61.6% 33,778
2 legs at 90°
DONE
RG07-1 BG-07 Remove bull gear BG-07
From the drawing
RG07 10-Aug-26 Gear case hoist (10t) 7,479 360 7,839 39.2% 4,318
2 legs at 60°
DONE
RG07-2 IG-13 Remove idler gear IG-13
From the drawing
RG07 10-Aug-26 Gear case hoist (10t) 1,603 360 1,963 9.8% 925
2 legs at 60°
DONE
RG07-3 IG-14 Remove idler gear IG-14
From the drawing
RG07 10-Aug-26 Gear case hoist (10t) 1,734 360 2,094 10.5% 1,001
2 legs at 60°
DONE
RG08-1 BG-08 Remove bull gear BG-08
From the drawing
RG08 10-Aug-26 Gear case hoist (10t) 7,576 360 7,936 39.7% 4,374
2 legs at 60°
DONE
RG08-2 IG-15 Remove idler gear IG-15
From the drawing
RG08 10-Aug-26 Gear case hoist (10t) 1,865 360 2,225 11.1% 1,077
2 legs at 60°
DONE
RG08-3 IG-16 Remove idler gear IG-16
From the drawing
RG08 10-Aug-26 Gear case hoist (10t) 1,996 360 2,356 11.8% 1,152
2 legs at 60°
DONE
RD05-1 D-05 Remove dryer D-05 (top tier)
From the drawing
RD05 11-Aug-26 Machine room crane (60t) 67,945 6,310 74,255 61.9% 33,972
2 legs at 90°
DONE
RD06-1 D-06 Remove dryer D-06 (bottom tier)
From the drawing
RD06 11-Aug-26 Machine room crane (60t) 68,334 6,310 74,644 62.2% 34,167
2 legs at 90°
DONE
RG09-1 BG-09 Remove bull gear BG-09
From the drawing
RG09 11-Aug-26 Gear case hoist (10t) 7,673 360 8,033 40.2% 4,430
2 legs at 60°
DONE
RG09-2 IG-17 Remove idler gear IG-17
From the drawing
RG09 11-Aug-26 Gear case hoist (10t) 2,127 360 2,487 12.4% 1,228
2 legs at 60°
DONE
RG09-3 IG-18 Remove idler gear IG-18
From the drawing
RG09 11-Aug-26 Gear case hoist (10t) 2,258 360 2,618 13.1% 1,304
2 legs at 60°
DONE
RG10-1 BG-10 Remove bull gear BG-10
From the drawing
RG10 11-Aug-26 Gear case hoist (10t) 7,770 360 8,130 40.6% 4,486
2 legs at 60°
DONE
RG10-2 IG-19 Remove idler gear IG-19
From the drawing
RG10 11-Aug-26 Gear case hoist (10t) 2,389 360 2,749 13.7% 1,379
2 legs at 60°
DONE
RG10-3 IG-20 Remove idler gear IG-20
From the drawing
RG10 11-Aug-26 Gear case hoist (10t) 2,520 360 2,880 14.4% 1,455
2 legs at 60°
DONE
RD07-1 D-07 Remove dryer D-07 (top tier)
From the drawing
RD07 12-Aug-26 Machine room crane (60t) 68,723 6,310 75,033 62.5% 34,362
2 legs at 90°
DONE
RD08-1 D-08 Remove dryer D-08 (bottom tier)
From the drawing
RD08 12-Aug-26 Machine room crane (60t) 69,112 6,310 75,422 62.9% 34,556
2 legs at 90°
DONE
RG11-1 BG-11 Remove bull gear BG-11
From the drawing
RG11 12-Aug-26 Gear case hoist (10t) 7,867 360 8,227 41.1% 4,542
2 legs at 60°
DONE
RG11-2 IG-21 Remove idler gear IG-21
From the drawing
RG11 12-Aug-26 Gear case hoist (10t) 2,651 360 3,011 15.1% 1,531
2 legs at 60°
DONE
RG11-3 IG-22 Remove idler gear IG-22
From the drawing
RG11 12-Aug-26 Gear case hoist (10t) 2,782 360 3,142 15.7% 1,606
2 legs at 60°
DONE
RG12-1 BG-12 Remove bull gear BG-12
From the drawing
RG12 12-Aug-26 Gear case hoist (10t) 7,964 360 8,324 41.6% 4,598
2 legs at 60°
DONE
RG12-2 IG-23 Remove idler gear IG-23
From the drawing
RG12 12-Aug-26 Gear case hoist (10t) 1,413 360 1,773 8.9% 816
2 legs at 60°
DONE
RG12-3 IG-24 Remove idler gear IG-24
From the drawing
RG12 12-Aug-26 Gear case hoist (10t) 1,544 360 1,904 9.5% 891
2 legs at 60°
DONE
RD09-1 D-09 Remove dryer D-09 (top tier)
From the drawing
RD09 13-Aug-26 Machine room crane (60t) 69,501 6,310 75,811 63.2% 34,750
2 legs at 90°
DONE
RD10-1 D-10 Remove dryer D-10 (bottom tier)
From the drawing
RD10 13-Aug-26 Machine room crane (60t) 69,890 6,310 76,200 63.5% 34,945
2 legs at 90°
DONE
RG13-1 BG-13 Remove bull gear BG-13
From the drawing
RG13 13-Aug-26 Gear case hoist (10t) 8,061 360 8,421 42.1% 4,654
2 legs at 60°
DONE
RG13-2 IG-25 Remove idler gear IG-25
From the drawing
RG13 13-Aug-26 Gear case hoist (10t) 1,675 360 2,035 10.2% 967
2 legs at 60°
DONE
RG13-3 IG-26 Remove idler gear IG-26
From the drawing
RG13 13-Aug-26 Gear case hoist (10t) 1,806 360 2,166 10.8% 1,043
2 legs at 60°
DONE
RG14-1 BG-14 Remove bull gear BG-14
From the drawing
RG14 13-Aug-26 Gear case hoist (10t) 8,158 360 8,518 42.6% 4,710
2 legs at 60°
DONE
RG14-2 IG-27 Remove idler gear IG-27
From the drawing
RG14 13-Aug-26 Gear case hoist (10t) 1,937 360 2,297 11.5% 1,118
2 legs at 60°
DONE
RD11-1 D-11 Remove dryer D-11 (top tier)
From the drawing
RD11 14-Aug-26 Machine room crane (60t) 70,279 6,310 76,589 63.8% 35,140
2 legs at 90°
DONE
RD12-1 D-12 Remove dryer D-12 (bottom tier)
From the drawing
RD12 14-Aug-26 Machine room crane (60t) 70,668 6,310 76,978 64.1% 35,334
2 legs at 90°
DONE
RD13-1 D-13 Remove dryer D-13 (top tier)
From the drawing
RD13 15-Aug-26 Machine room crane (60t) 71,057 6,310 77,367 64.5% 35,528
2 legs at 90°
DONE
RD14-1 D-14 Remove dryer D-14 (bottom tier)
From the drawing
RD14 15-Aug-26 Machine room crane (60t) 71,446 6,310 77,756 64.8% 35,723
2 legs at 90°
DONE
ID01-1 D-01N Set new dryer D-01 (top tier)
Certified (scale or OEM certificate)
ID01 17-Aug-26 Machine room crane (60t) 67,089 6,310 73,399 61.2% 33,544
2 legs at 90°
DONE
ID02-1 D-02N Set new dryer D-02 (bottom tier)
Certified (scale or OEM certificate)
ID02 17-Aug-26 Machine room crane (60t) 67,478 6,310 73,788 61.5% 33,739
2 legs at 90°
DONE
IN010-1 NPF-TS Set new tending-side press frame
Certified (scale or OEM certificate)
IN010 17-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 78 ft radius
30,180 5,300 35,480 30.6% 17,424
2 legs at 60°
DONE
IN010-2 NPF-DS Set new drive-side press frame
Certified (scale or OEM certificate)
IN010 17-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 84 ft radius
33,480 5,300 38,780 39.6% 19,330
2 legs at 60°
DONE
IB01-1 BB-1N Install new blow box BB-1
Certified (scale or OEM certificate)
IB01 18-Aug-26 Machine room crane (60t) 2,840 2,522 5,362 4.5% 1,640
2 legs at 60°
DONE
ID03-1 D-03N Set new dryer D-03 (top tier)
Certified (scale or OEM certificate)
ID03 18-Aug-26 Machine room crane (60t) 67,867 6,310 74,177 61.8% 33,934
2 legs at 90°
DONE
ID04-1 D-04N Set new dryer D-04 (bottom tier)
Certified (scale or OEM certificate)
ID04 18-Aug-26 Machine room crane (60t) 68,256 6,310 74,566 62.1% 34,128
2 legs at 90°
DONE
IF01-1 FR-01N Install new felt roll FR-01
Certified (scale or OEM certificate)
IF01 18-Aug-26 Machine room crane (60t) 10,393 3,668 14,061 11.7% 6,000
2 legs at 60°
DONE
IG01-1 BG-01N Install new bull gear BG-01
Certified (scale or OEM certificate)
IG01 18-Aug-26 Gear case hoist (10t) 7,047 360 7,407 37% 4,069
2 legs at 60°
DONE
IG01-2 IG-01N Install new idler gear IG-01
Certified (scale or OEM certificate)
IG01 18-Aug-26 Gear case hoist (10t) 1,591 360 1,951 9.8% 919
2 legs at 60°
DONE
IG01-3 IG-02N Install new idler gear IG-02
Certified (scale or OEM certificate)
IG01 18-Aug-26 Gear case hoist (10t) 1,722 360 2,082 10.4% 994
2 legs at 60°
DONE
IG02-1 BG-02N Install new bull gear BG-02
Certified (scale or OEM certificate)
IG02 18-Aug-26 Gear case hoist (10t) 7,144 360 7,504 37.5% 4,125
2 legs at 60°
DONE
IG02-2 IG-03N Install new idler gear IG-03
Certified (scale or OEM certificate)
IG02 18-Aug-26 Gear case hoist (10t) 1,853 360 2,213 11.1% 1,070
2 legs at 60°
DONE
IG02-3 IG-04N Install new idler gear IG-04
Certified (scale or OEM certificate)
IG02 18-Aug-26 Gear case hoist (10t) 1,984 360 2,344 11.7% 1,145
2 legs at 60°
DONE
ID05-1 D-05N Set new dryer D-05 (top tier)
Certified (scale or OEM certificate)
ID05 19-Aug-26 Machine room crane (60t) 68,645 6,310 74,955 62.5% 34,322
2 legs at 90°
DONE
ID06-1 D-06N Set new dryer D-06 (bottom tier)
Certified (scale or OEM certificate)
ID06 19-Aug-26 Machine room crane (60t) 69,034 6,310 75,344 62.8% 34,517
2 legs at 90°
DONE
IG03-1 BG-03N Install new bull gear BG-03
Certified (scale or OEM certificate)
IG03 19-Aug-26 Gear case hoist (10t) 7,241 360 7,601 38% 4,181
2 legs at 60°
DONE
IG03-2 IG-05N Install new idler gear IG-05
Certified (scale or OEM certificate)
IG03 19-Aug-26 Gear case hoist (10t) 2,115 360 2,475 12.4% 1,221
2 legs at 60°
DONE
IG03-3 IG-06N Install new idler gear IG-06
Certified (scale or OEM certificate)
IG03 19-Aug-26 Gear case hoist (10t) 2,246 360 2,606 13% 1,297
2 legs at 60°
DONE
IG04-1 BG-04N Install new bull gear BG-04
Certified (scale or OEM certificate)
IG04 19-Aug-26 Gear case hoist (10t) 7,338 360 7,698 38.5% 4,237
2 legs at 60°
DONE
IG04-2 IG-07N Install new idler gear IG-07
Certified (scale or OEM certificate)
IG04 19-Aug-26 Gear case hoist (10t) 2,377 360 2,737 13.7% 1,372
2 legs at 60°
DONE
IG04-3 IG-08N Install new idler gear IG-08
Certified (scale or OEM certificate)
IG04 19-Aug-26 Gear case hoist (10t) 2,508 360 2,868 14.3% 1,448
2 legs at 60°
DONE
ID07-1 D-07N Set new dryer D-07 (top tier)
Certified (scale or OEM certificate)
ID07 20-Aug-26 Machine room crane (60t) 69,423 6,310 75,733 63.1% 34,712
2 legs at 90°
DONE
ID08-1 D-08N Set new dryer D-08 (bottom tier)
Certified (scale or OEM certificate)
ID08 20-Aug-26 Machine room crane (60t) 69,812 6,310 76,122 63.4% 34,906
2 legs at 90°
DONE
IG05-1 BG-05N Install new bull gear BG-05
Certified (scale or OEM certificate)
IG05 20-Aug-26 Gear case hoist (10t) 7,435 360 7,795 39% 4,293
2 legs at 60°
DONE
IG05-2 IG-09N Install new idler gear IG-09
Certified (scale or OEM certificate)
IG05 20-Aug-26 Gear case hoist (10t) 2,639 360 2,999 15% 1,524
2 legs at 60°
DONE
IG05-3 IG-10N Install new idler gear IG-10
Certified (scale or OEM certificate)
IG05 20-Aug-26 Gear case hoist (10t) 2,770 360 3,130 15.7% 1,599
2 legs at 60°
DONE
IG06-1 BG-06N Install new bull gear BG-06
Certified (scale or OEM certificate)
IG06 20-Aug-26 Gear case hoist (10t) 7,532 360 7,892 39.5% 4,349
2 legs at 60°
DONE
IG06-2 IG-11N Install new idler gear IG-11
Certified (scale or OEM certificate)
IG06 20-Aug-26 Gear case hoist (10t) 2,901 360 3,261 16.3% 1,675
2 legs at 60°
DONE
IG06-3 IG-12N Install new idler gear IG-12
Certified (scale or OEM certificate)
IG06 20-Aug-26 Gear case hoist (10t) 1,532 360 1,892 9.5% 885
2 legs at 60°
DONE
ID09-1 D-09N Set new dryer D-09 (top tier)
Certified (scale or OEM certificate)
ID09 21-Aug-26 Machine room crane (60t) 70,201 6,310 76,511 63.8% 35,100
2 legs at 90°
DONE
ID10-1 D-10N Set new dryer D-10 (bottom tier)
Certified (scale or OEM certificate)
ID10 21-Aug-26 Machine room crane (60t) 70,590 6,310 76,900 64.1% 35,295
2 legs at 90°
DONE
IG07-1 BG-07N Install new bull gear BG-07
Certified (scale or OEM certificate)
IG07 21-Aug-26 Gear case hoist (10t) 7,629 360 7,989 39.9% 4,405
2 legs at 60°
DONE
IG07-2 IG-13N Install new idler gear IG-13
Certified (scale or OEM certificate)
IG07 21-Aug-26 Gear case hoist (10t) 1,663 360 2,023 10.1% 960
2 legs at 60°
DONE
IG07-3 IG-14N Install new idler gear IG-14
Certified (scale or OEM certificate)
IG07 21-Aug-26 Gear case hoist (10t) 1,794 360 2,154 10.8% 1,036
2 legs at 60°
DONE
IG08-1 BG-08N Install new bull gear BG-08
Certified (scale or OEM certificate)
IG08 21-Aug-26 Gear case hoist (10t) 7,726 360 8,086 40.4% 4,461
2 legs at 60°
DONE
IG08-2 IG-15N Install new idler gear IG-15
Certified (scale or OEM certificate)
IG08 21-Aug-26 Gear case hoist (10t) 1,925 360 2,285 11.4% 1,111
2 legs at 60°
DONE
IG08-3 IG-16N Install new idler gear IG-16
Certified (scale or OEM certificate)
IG08 21-Aug-26 Gear case hoist (10t) 2,056 360 2,416 12.1% 1,187
2 legs at 60°
DONE
ID11-1 D-11N Set new dryer D-11 (top tier)
Certified (scale or OEM certificate)
ID11 22-Aug-26 Machine room crane (60t) 70,979 6,310 77,289 64.4% 35,490
2 legs at 90°
DONE
ID12-1 D-12N Set new dryer D-12 (bottom tier)
Certified (scale or OEM certificate)
ID12 22-Aug-26 Machine room crane (60t) 71,368 6,310 77,678 64.7% 35,684
2 legs at 90°
DONE
IF08-1 FR-08N Install new felt roll FR-08
Certified (scale or OEM certificate)
IF08 22-Aug-26 Machine room crane (60t) 13,004 3,668 16,672 13.9% 7,508
2 legs at 60°
DONE
IG09-1 BG-09N Install new bull gear BG-09
Certified (scale or OEM certificate)
IG09 22-Aug-26 Gear case hoist (10t) 7,823 360 8,183 40.9% 4,517
2 legs at 60°
DONE
IG09-2 IG-17N Install new idler gear IG-17
Certified (scale or OEM certificate)
IG09 22-Aug-26 Gear case hoist (10t) 2,187 360 2,547 12.7% 1,263
2 legs at 60°
DONE
IG09-3 IG-18N Install new idler gear IG-18
Certified (scale or OEM certificate)
IG09 22-Aug-26 Gear case hoist (10t) 2,318 360 2,678 13.4% 1,338
2 legs at 60°
DONE
IG10-1 BG-10N Install new bull gear BG-10
Certified (scale or OEM certificate)
IG10 22-Aug-26 Gear case hoist (10t) 7,920 360 8,280 41.4% 4,573
2 legs at 60°
DONE
IG10-2 IG-19N Install new idler gear IG-19
Certified (scale or OEM certificate)
IG10 22-Aug-26 Gear case hoist (10t) 2,449 360 2,809 14% 1,414
2 legs at 60°
DONE
IG10-3 IG-20N Install new idler gear IG-20
Certified (scale or OEM certificate)
IG10 22-Aug-26 Gear case hoist (10t) 2,580 360 2,940 14.7% 1,490
2 legs at 60°
DONE
ID13-1 D-13N Set new dryer D-13 (top tier)
Certified (scale or OEM certificate)
ID13 23-Aug-26 Machine room crane (60t) 71,757 6,310 78,067 65.1% 35,878
2 legs at 90°
DONE
ID14-1 D-14N Set new dryer D-14 (bottom tier)
Certified (scale or OEM certificate)
ID14 23-Aug-26 Machine room crane (60t) 72,146 6,310 78,456 65.4% 36,073
2 legs at 90°
DONE
IF09-1 FR-09N Install new felt roll FR-09
Certified (scale or OEM certificate)
IF09 23-Aug-26 Machine room crane (60t) 13,377 3,668 17,045 14.2% 7,723
2 legs at 60°
DONE
IG11-1 BG-11N Install new bull gear BG-11
Certified (scale or OEM certificate)
IG11 23-Aug-26 Gear case hoist (10t) 8,017 360 8,377 41.9% 4,629
2 legs at 60°
DONE
IG11-2 IG-21N Install new idler gear IG-21
Certified (scale or OEM certificate)
IG11 23-Aug-26 Gear case hoist (10t) 2,711 360 3,071 15.4% 1,565
2 legs at 60°
DONE
IG11-3 IG-22N Install new idler gear IG-22
Certified (scale or OEM certificate)
IG11 23-Aug-26 Gear case hoist (10t) 2,842 360 3,202 16% 1,641
2 legs at 60°
DONE
IG12-1 BG-12N Install new bull gear BG-12
Certified (scale or OEM certificate)
IG12 23-Aug-26 Gear case hoist (10t) 8,114 360 8,474 42.4% 4,685
2 legs at 60°
DONE
IG12-2 IG-23N Install new idler gear IG-23
Certified (scale or OEM certificate)
IG12 23-Aug-26 Gear case hoist (10t) 1,473 360 1,833 9.2% 850
2 legs at 60°
DONE
IG12-3 IG-24N Install new idler gear IG-24
Certified (scale or OEM certificate)
IG12 23-Aug-26 Gear case hoist (10t) 1,604 360 1,964 9.8% 926
2 legs at 60°
DONE
IB02-1 BB-2N Install new blow box BB-2
Certified (scale or OEM certificate)
IB02 24-Aug-26 Machine room crane (60t) 2,980 2,522 5,502 4.6% 1,721
2 legs at 60°
DONE
IF02-1 FR-02N Install new felt roll FR-02
Certified (scale or OEM certificate)
IF02 24-Aug-26 Machine room crane (60t) 10,766 3,668 14,434 12% 6,216
2 legs at 60°
DONE
IF10-1 FR-10N Install new felt roll FR-10
Certified (scale or OEM certificate)
IF10 24-Aug-26 Machine room crane (60t) 13,750 3,668 17,418 14.5% 7,939
2 legs at 60°
DONE
IG13-1 BG-13N Install new bull gear BG-13
Certified (scale or OEM certificate)
IG13 24-Aug-26 Gear case hoist (10t) 8,211 360 8,571 42.9% 4,741
2 legs at 60°
DONE
IG13-2 IG-25N Install new idler gear IG-25
Certified (scale or OEM certificate)
IG13 24-Aug-26 Gear case hoist (10t) 1,735 360 2,095 10.5% 1,002
2 legs at 60°
DONE
IG13-3 IG-26N Install new idler gear IG-26
Certified (scale or OEM certificate)
IG13 24-Aug-26 Gear case hoist (10t) 1,866 360 2,226 11.1% 1,077
2 legs at 60°
DONE
IG14-1 BG-14N Install new bull gear BG-14
Certified (scale or OEM certificate)
IG14 24-Aug-26 Gear case hoist (10t) 8,308 360 8,668 43.3% 4,797
2 legs at 60°
DONE
IG14-2 IG-27N Install new idler gear IG-27
Certified (scale or OEM certificate)
IG14 24-Aug-26 Gear case hoist (10t) 1,997 360 2,357 11.8% 1,153
2 legs at 60°
DONE
IN020-1 NPR-SPU Install new suction pick-up roll
Certified (scale or OEM certificate)
IN020 24-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 74 ft radius
39,100 11,050 50,150 43.2% 19,550
2 legs at 90°
DONE
IN020-2 NPR-1T Install new 1st press top roll
Certified (scale or OEM certificate)
IN020 24-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 80 ft radius
53,200 11,050 64,250 55.4% 26,600
2 legs at 90°
DONE
IN020-3 NPR-SP Install new suction press roll
Certified (scale or OEM certificate)
IN020 24-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 88 ft radius
63,800 11,050 74,850 76.4% 31,900
2 legs at 90°
DONE CRITICAL LIFT
IN020-4 NPR-2T Install new 2nd press top roll
Certified (scale or OEM certificate)
IN020 24-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 82 ft radius
48,400 11,050 59,450 60.7% 24,200
2 legs at 90°
DONE
IN020-5 NPR-2B Install new 2nd press bottom roll
Certified (scale or OEM certificate)
IN020 24-Aug-26 Mobile crane (250t)
150 ft main boom, full counterweight · 86 ft radius
45,000 11,050 56,050 57.2% 22,500
2 legs at 90°
DONE
IB03-1 BB-3N Install new blow box BB-3
Certified (scale or OEM certificate)
IB03 25-Aug-26 Machine room crane (60t) 3,120 2,522 5,642 4.7% 1,801
2 legs at 60°
DONE
IF03-1 FR-03N Install new felt roll FR-03
Certified (scale or OEM certificate)
IF03 25-Aug-26 Machine room crane (60t) 11,139 3,668 14,807 12.3% 6,431
2 legs at 60°
DONE
IF11-1 FR-11N Install new felt roll FR-11
Certified (scale or OEM certificate)
IF11 25-Aug-26 Machine room crane (60t) 14,123 3,668 17,791 14.8% 8,154
2 legs at 60°
DONE
IB04-1 BB-4N Install new blow box BB-4
Certified (scale or OEM certificate)
IB04 26-Aug-26 Machine room crane (60t) 3,260 2,522 5,782 4.8% 1,882
2 legs at 60°
DONE
IF04-1 FR-04N Install new felt roll FR-04
Certified (scale or OEM certificate)
IF04 26-Aug-26 Machine room crane (60t) 11,512 3,668 15,180 12.7% 6,646
2 legs at 60°
DONE
IF12-1 FR-12N Install new felt roll FR-12
Certified (scale or OEM certificate)
IF12 26-Aug-26 Machine room crane (60t) 14,496 3,668 18,164 15.1% 8,369
2 legs at 60°
DONE
IB05-1 BB-5N Install new blow box BB-5
Certified (scale or OEM certificate)
IB05 27-Aug-26 Machine room crane (60t) 3,400 2,522 5,922 4.9% 1,963
2 legs at 60°
DONE
IF05-1 FR-05N Install new felt roll FR-05
Certified (scale or OEM certificate)
IF05 27-Aug-26 Machine room crane (60t) 11,885 3,668 15,553 13% 6,862
2 legs at 60°
DONE
IF13-1 FR-13N Install new felt roll FR-13
Certified (scale or OEM certificate)
IF13 27-Aug-26 Machine room crane (60t) 10,069 3,668 13,737 11.4% 5,813
2 legs at 60°
DONE
IB06-1 BB-6N Install new blow box BB-6
Certified (scale or OEM certificate)
IB06 28-Aug-26 Machine room crane (60t) 3,540 2,522 6,062 5.1% 2,044
2 legs at 60°
DONE
IF06-1 FR-06N Install new felt roll FR-06
Certified (scale or OEM certificate)
IF06 28-Aug-26 Machine room crane (60t) 12,258 3,668 15,926 13.3% 7,077
2 legs at 60°
DONE
IF07-1 FR-07N Install new felt roll FR-07
Certified (scale or OEM certificate)
IF07 29-Aug-26 Machine room crane (60t) 12,631 3,668 16,299 13.6% 7,293
2 legs at 60°
DONE
Source: lift_plan, lift_gear, rigging_gear, lift_crane, lift_chart, activity

Cranes and hoists

Gear case hoist (10t) Chain hoist or come-along

Rated 20,000 lb · hook block 180 lb · inspected 2026-04-25 · 82 lifts, highest 43.3% of chart

Machine room crane (60t) Overhead bridge crane

Rated 120,000 lb · hook block 2,500 lb · inspected 2026-04-25 · 66 lifts, highest 65.4% of chart

Mobile crane (250t) Mobile crane

Rated 500,000 lb · hook block 4,800 lb · inspected 2026-04-25 · 14 lifts, highest 87.0% of chart

Load chart (9 points)
Set-upRadius ftCapacity lb
150 ft main boom, full counterweight30330,000
150 ft main boom, full counterweight40262,000
150 ft main boom, full counterweight50207,000
150 ft main boom, full counterweight60168,000
150 ft main boom, full counterweight70139,000
150 ft main boom, full counterweight80116,000
150 ft main boom, full counterweight9098,000
150 ft main boom, full counterweight10083,000
150 ft main boom, full counterweight11071,000
Add or update a crane

Rigging by tag

TagWhatWLL lbWeight lbInspected
BC-01Beam trolley over the gear case, 10 t
Beam clamp or trolley
20,0001602026-04-25
LL-01Gear lifting eye bolts, pair, 5 t
Hook or lifting lug
10,00062026-04-25
SH-01Bolt-type shackle, 35 t
Shackle
70,000952026-04-25
SH-10Bolt-type shackle, 17 t
Shackle
34,000402026-04-25
SH-20Screw-pin shackle, 8.5 t
Shackle
17,000122026-04-25
SH-30Screw-pin shackle, 3.25 t
Shackle
6,50032026-04-25
SL-051-1/2 in wire rope sling, 16 ft, choked on journal
Sling
42,0002102026-04-25
SL-061-3/4 in wire rope sling, 20 ft, choked on journal
Sling
56,0003302026-04-25
SL-10Round sling, 12 ft, vertical
Sling
21,200222026-04-25
SL-20Round sling, 8 ft, vertical
Sling
8,40082026-04-25
SL-30Nylon web sling, 2 in, 6 ft, vertical
Sling
6,40042026-04-25
SP-01Dryer spreader beam, 40 t, 14 ft
Spreader or lifting beam
80,0003,2002026-04-25
SP-02Press roll spreader beam, 60 t, 20 ft
Spreader or lifting beam
120,0005,4002026-04-25
SP-03Felt roll lifting beam, 10 t, 26 ft
Spreader or lifting beam
20,0001,1002026-04-25
Add or update rigging

New lift plan

Load
Crane
Rigging
People and area