Safety control center
Safety comes first on this project. Every pre-task plan, permit, inspection, corrective action, incident, stop-work and toolbox talk is recorded here with who entered it. Anyone may stop work. Safety reports stay open to every field supervisor at all times.
Expired
0
Source: safety_permit
Open
0
Source: safety_permit
Issued
0
Source: safety_permit
Closed
233
Source: safety_permit
Cancelled
0
Source: safety_permit
Permits to work
A permit covers one shift or day. Past its end and not closed, it shows EXPIRED and the work under it stops until it is closed or reissued.
| Ref | Kind | Trade | Location and work | Conditions | Holder | Valid | State | |
|---|---|---|---|---|---|---|---|---|
| PTW-233 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-21 06:30 to 2026-09-21 18:30 |
CLOSED Priya Raman 2026-09-21 18:30 Work complete, area left safe |
|
| PTW-232 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-20 06:30 to 2026-09-20 18:30 |
CLOSED Priya Raman 2026-09-20 18:30 Work complete, area left safe |
|
| PTW-231 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-19 06:30 to 2026-09-19 18:30 |
CLOSED Priya Raman 2026-09-19 18:30 Work complete, area left safe |
|
| PTW-230 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-18 06:30 to 2026-09-18 18:30 |
CLOSED Priya Raman 2026-09-18 18:30 Work complete, area left safe |
|
| PTW-229 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-17 06:30 to 2026-09-17 18:30 |
CLOSED Priya Raman 2026-09-17 18:30 Work complete, area left safe |
|
| PTW-228 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-16 06:30 to 2026-09-16 18:30 |
CLOSED Priya Raman 2026-09-16 18:30 Work complete, area left safe |
|
| PTW-227 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-15 06:30 to 2026-09-15 18:30 |
CLOSED Priya Raman 2026-09-15 18:30 Work complete, area left safe |
|
| PTW-226 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-14 06:30 to 2026-09-14 18:30 |
CLOSED Priya Raman 2026-09-14 18:30 Work complete, area left safe |
|
| PTW-225 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-13 06:30 to 2026-09-13 18:30 |
CLOSED Priya Raman 2026-09-13 18:30 Work complete, area left safe |
|
| PTW-224 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-12 06:30 to 2026-09-12 18:30 |
CLOSED Priya Raman 2026-09-12 18:30 Work complete, area left safe |
|
| PTW-223 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-11 06:30 to 2026-09-11 18:30 |
CLOSED Priya Raman 2026-09-11 18:30 Work complete, area left safe |
|
| PTW-222 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-10 06:30 to 2026-09-10 18:30 |
CLOSED Priya Raman 2026-09-10 18:30 Work complete, area left safe |
|
| PTW-221 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-09 06:30 to 2026-09-09 18:30 |
CLOSED Priya Raman 2026-09-09 18:30 Work complete, area left safe |
|
| PTW-220 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-08 06:30 to 2026-09-08 18:30 |
CLOSED Priya Raman 2026-09-08 18:30 Work complete, area left safe |
|
| PTW-219 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-07 06:30 to 2026-09-07 18:30 |
CLOSED Priya Raman 2026-09-07 18:30 Work complete, area left safe |
|
| PTW-218 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-06 06:30 to 2026-09-06 18:30 |
CLOSED Priya Raman 2026-09-06 18:30 Work complete, area left safe |
|
| PTW-217 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-05 06:30 to 2026-09-05 18:30 |
CLOSED Priya Raman 2026-09-05 18:30 Work complete, area left safe |
|
| PTW-216 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-04 06:30 to 2026-09-04 18:30 |
CLOSED Priya Raman 2026-09-04 18:30 Work complete, area left safe |
|
| PTW-213 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-09-03 06:30 to 2026-09-03 18:30 |
CLOSED Dale Whitaker 2026-09-03 18:30 Work complete, area left safe |
|
| PTW-214 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-09-03 06:30 to 2026-09-03 18:30 |
CLOSED Marcus Lee 2026-09-03 18:30 Work complete, area left safe |
|
| PTW-215 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-03 06:30 to 2026-09-03 18:30 |
CLOSED Priya Raman 2026-09-03 18:30 Work complete, area left safe |
|
| PTW-209 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-09-02 06:30 to 2026-09-02 18:30 |
CLOSED Dale Whitaker 2026-09-02 18:30 Work complete, area left safe |
|
| PTW-210 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-09-02 06:30 to 2026-09-02 18:30 |
CLOSED Marcus Lee 2026-09-02 18:30 Work complete, area left safe |
|
| PTW-211 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-09-02 06:30 to 2026-09-02 18:30 |
CLOSED Tony Alvarez 2026-09-02 18:30 Work complete, area left safe |
|
| PTW-212 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-02 06:30 to 2026-09-02 18:30 |
CLOSED Priya Raman 2026-09-02 18:30 Work complete, area left safe |
|
| PTW-205 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-09-01 06:30 to 2026-09-01 18:30 |
CLOSED Dale Whitaker 2026-09-01 18:30 Work complete, area left safe |
|
| PTW-206 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-09-01 06:30 to 2026-09-01 18:30 |
CLOSED Marcus Lee 2026-09-01 18:30 Work complete, area left safe |
|
| PTW-207 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-09-01 06:30 to 2026-09-01 18:30 |
CLOSED Tony Alvarez 2026-09-01 18:30 Work complete, area left safe |
|
| PTW-208 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-09-01 06:30 to 2026-09-01 18:30 |
CLOSED Priya Raman 2026-09-01 18:30 Work complete, area left safe |
|
| PTW-200 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-31 06:30 to 2026-08-31 18:30 |
CLOSED Dale Whitaker 2026-08-31 18:30 Work complete, area left safe |
|
| PTW-201 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-31 06:30 to 2026-08-31 18:30 |
CLOSED Marcus Lee 2026-08-31 18:30 Work complete, area left safe |
|
| PTW-202 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-31 06:30 to 2026-08-31 18:30 |
CLOSED Tony Alvarez 2026-08-31 18:30 Work complete, area left safe |
|
| PTW-203 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-31 06:30 to 2026-08-31 18:30 |
CLOSED Priya Raman 2026-08-31 18:30 Work complete, area left safe |
|
| PTW-204 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-31 06:30 to 2026-08-31 18:30 |
CLOSED Hannah Price 2026-08-31 18:30 Work complete, area left safe |
|
| PTW-195 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-30 06:30 to 2026-08-30 18:30 |
CLOSED Dale Whitaker 2026-08-30 18:30 Work complete, area left safe |
|
| PTW-196 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-30 06:30 to 2026-08-30 18:30 |
CLOSED Marcus Lee 2026-08-30 18:30 Work complete, area left safe |
|
| PTW-197 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-30 06:30 to 2026-08-30 18:30 |
CLOSED Tony Alvarez 2026-08-30 18:30 Work complete, area left safe |
|
| PTW-198 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-30 06:30 to 2026-08-30 18:30 |
CLOSED Priya Raman 2026-08-30 18:30 Work complete, area left safe |
|
| PTW-199 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-30 06:30 to 2026-08-30 18:30 |
CLOSED Hannah Price 2026-08-30 18:30 Work complete, area left safe |
|
| PTW-189 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-29 06:30 to 2026-08-29 18:30 |
CLOSED Dale Whitaker 2026-08-29 18:30 Work complete, area left safe |
|
| PTW-190 | Critical lift | RIG | Press section and north pad Press roll picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-29 06:30 to 2026-08-29 18:30 |
CLOSED R. Okafor 2026-08-29 18:30 Work complete, area left safe |
|
| PTW-191 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-29 06:30 to 2026-08-29 18:30 |
CLOSED Marcus Lee 2026-08-29 18:30 Work complete, area left safe |
|
| PTW-192 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-29 06:30 to 2026-08-29 18:30 |
CLOSED Tony Alvarez 2026-08-29 18:30 Work complete, area left safe |
|
| PTW-193 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-29 06:30 to 2026-08-29 18:30 |
CLOSED Priya Raman 2026-08-29 18:30 Work complete, area left safe |
|
| PTW-194 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-29 06:30 to 2026-08-29 18:30 |
CLOSED Hannah Price 2026-08-29 18:30 Work complete, area left safe |
|
| PTW-183 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-28 06:30 to 2026-08-28 18:30 |
CLOSED Dale Whitaker 2026-08-28 18:30 Work complete, area left safe |
|
| PTW-184 | Critical lift | RIG | Press section and north pad Press roll picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-28 06:30 to 2026-08-28 18:30 |
CLOSED R. Okafor 2026-08-28 18:30 Work complete, area left safe |
|
| PTW-185 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-28 06:30 to 2026-08-28 18:30 |
CLOSED Marcus Lee 2026-08-28 18:30 Work complete, area left safe |
|
| PTW-186 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-28 06:30 to 2026-08-28 18:30 |
CLOSED Tony Alvarez 2026-08-28 18:30 Work complete, area left safe |
|
| PTW-187 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-28 06:30 to 2026-08-28 18:30 |
CLOSED Priya Raman 2026-08-28 18:30 Work complete, area left safe |
|
| PTW-188 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-28 06:30 to 2026-08-28 18:30 |
CLOSED Hannah Price 2026-08-28 18:30 Work complete, area left safe |
|
| PTW-177 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-27 06:30 to 2026-08-27 18:30 |
CLOSED Dale Whitaker 2026-08-27 18:30 Work complete, area left safe |
|
| PTW-178 | Critical lift | RIG | Press section and north pad Press roll picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-27 06:30 to 2026-08-27 18:30 |
CLOSED R. Okafor 2026-08-27 18:30 Work complete, area left safe |
|
| PTW-179 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-27 06:30 to 2026-08-27 18:30 |
CLOSED Marcus Lee 2026-08-27 18:30 Work complete, area left safe |
|
| PTW-180 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-27 06:30 to 2026-08-27 18:30 |
CLOSED Tony Alvarez 2026-08-27 18:30 Work complete, area left safe |
|
| PTW-181 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-27 06:30 to 2026-08-27 18:30 |
CLOSED Priya Raman 2026-08-27 18:30 Work complete, area left safe |
|
| PTW-182 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-27 06:30 to 2026-08-27 18:30 |
CLOSED Hannah Price 2026-08-27 18:30 Work complete, area left safe |
|
| PTW-170 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-26 06:30 to 2026-08-26 18:30 |
CLOSED Dale Whitaker 2026-08-26 18:30 Work complete, area left safe |
|
| PTW-171 | Critical lift | RIG | Press section and north pad Press roll picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-26 06:30 to 2026-08-26 18:30 |
CLOSED R. Okafor 2026-08-26 18:30 Work complete, area left safe |
|
| PTW-172 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-26 06:30 to 2026-08-26 18:30 |
CLOSED Marcus Lee 2026-08-26 18:30 Work complete, area left safe |
|
| PTW-173 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-26 06:30 to 2026-08-26 18:30 |
CLOSED Tony Alvarez 2026-08-26 18:30 Work complete, area left safe |
|
| PTW-174 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-26 06:30 to 2026-08-26 18:30 |
CLOSED Priya Raman 2026-08-26 18:30 Work complete, area left safe |
|
| PTW-175 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-26 06:30 to 2026-08-26 18:30 |
CLOSED Wes Turner 2026-08-26 18:30 Work complete, area left safe |
|
| PTW-176 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-26 06:30 to 2026-08-26 18:30 |
CLOSED Hannah Price 2026-08-26 18:30 Work complete, area left safe |
|
| PTW-163 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-25 06:30 to 2026-08-25 18:30 |
CLOSED Dale Whitaker 2026-08-25 18:30 Work complete, area left safe |
|
| PTW-164 | Critical lift | RIG | Press section and north pad Press roll picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-25 06:30 to 2026-08-25 18:30 |
CLOSED R. Okafor 2026-08-25 18:30 Work complete, area left safe |
|
| PTW-165 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-25 06:30 to 2026-08-25 18:30 |
CLOSED Marcus Lee 2026-08-25 18:30 Work complete, area left safe |
|
| PTW-166 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-25 06:30 to 2026-08-25 18:30 |
CLOSED Tony Alvarez 2026-08-25 18:30 Work complete, area left safe |
|
| PTW-167 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-25 06:30 to 2026-08-25 18:30 |
CLOSED Priya Raman 2026-08-25 18:30 Work complete, area left safe |
|
| PTW-168 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-25 06:30 to 2026-08-25 18:30 |
CLOSED Wes Turner 2026-08-25 18:30 Work complete, area left safe |
|
| PTW-169 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-25 06:30 to 2026-08-25 18:30 |
CLOSED Hannah Price 2026-08-25 18:30 Work complete, area left safe |
|
| PTW-157 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-24 06:30 to 2026-08-24 18:30 |
CLOSED Dale Whitaker 2026-08-24 18:30 Work complete, area left safe |
|
| PTW-158 | Critical lift | RIG | Press section and north pad Press roll picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-24 06:30 to 2026-08-24 18:30 |
CLOSED R. Okafor 2026-08-24 18:30 Work complete, area left safe |
|
| PTW-159 | Hot work | PIPE | Basement, drive side Weld steam joint supports | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-24 06:30 to 2026-08-24 18:30 |
CLOSED Marcus Lee 2026-08-24 18:30 Work complete, area left safe |
|
| PTW-160 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-24 06:30 to 2026-08-24 18:30 |
CLOSED Tony Alvarez 2026-08-24 18:30 Work complete, area left safe |
|
| PTW-161 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-24 06:30 to 2026-08-24 18:30 |
CLOSED Priya Raman 2026-08-24 18:30 Work complete, area left safe |
|
| PTW-162 | Work at height | SURV | Press and dryer section Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Hannah Price issued by Carl Mendez, Superintendent | 2026-08-24 06:30 to 2026-08-24 18:30 |
CLOSED Hannah Price 2026-08-24 18:30 Work complete, area left safe |
|
| PTW-150 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-23 12:00 to 2026-08-23 23:00 |
CLOSED Dale Whitaker 2026-08-23 23:00 Work complete, area left safe |
|
| PTW-151 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-23 12:00 to 2026-08-23 23:00 |
CLOSED Dale Whitaker 2026-08-23 23:00 Work complete, area left safe |
|
| PTW-152 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-23 12:00 to 2026-08-23 23:00 |
CLOSED Marcus Lee 2026-08-23 23:00 Work complete, area left safe |
|
| PTW-153 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-23 12:00 to 2026-08-23 23:00 |
CLOSED Tony Alvarez 2026-08-23 23:00 Work complete, area left safe |
|
| PTW-154 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-23 12:00 to 2026-08-23 23:00 |
CLOSED Priya Raman 2026-08-23 23:00 Work complete, area left safe |
|
| PTW-155 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-23 12:00 to 2026-08-23 23:00 |
CLOSED R. Okafor 2026-08-23 23:00 Work complete, area left safe |
|
| PTW-145 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-22 06:30 to 2026-08-22 18:30 |
CLOSED Dale Whitaker 2026-08-22 18:30 Work complete, area left safe |
|
| PTW-146 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-22 06:30 to 2026-08-22 18:30 |
CLOSED Dale Whitaker 2026-08-22 18:30 Work complete, area left safe |
|
| PTW-147 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-22 06:30 to 2026-08-22 18:30 |
CLOSED Marcus Lee 2026-08-22 18:30 Work complete, area left safe |
|
| PTW-148 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-22 06:30 to 2026-08-22 18:30 |
CLOSED Tony Alvarez 2026-08-22 18:30 Work complete, area left safe |
|
| PTW-149 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-22 06:30 to 2026-08-22 18:30 |
CLOSED Priya Raman 2026-08-22 18:30 Work complete, area left safe |
|
| PTW-140 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-21 06:30 to 2026-08-21 18:30 |
CLOSED Dale Whitaker 2026-08-21 18:30 Work complete, area left safe |
|
| PTW-141 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-21 06:30 to 2026-08-21 18:30 |
CLOSED Dale Whitaker 2026-08-21 18:30 Work complete, area left safe |
|
| PTW-142 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-21 06:30 to 2026-08-21 18:30 |
CLOSED Marcus Lee 2026-08-21 18:30 Work complete, area left safe |
|
| PTW-143 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-21 06:30 to 2026-08-21 18:30 |
CLOSED Tony Alvarez 2026-08-21 18:30 Work complete, area left safe |
|
| PTW-144 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-21 06:30 to 2026-08-21 18:30 |
CLOSED Priya Raman 2026-08-21 18:30 Work complete, area left safe |
|
| PTW-156 | Confined space entry | QAQC | Dryer D-03 manway Internal inspection of new dryer D-03 before the hydro test | Gas test O2 20.9%, LEL 0; attendant at the manway | Grant Fowler issued by Carl Mendez, Superintendent | 2026-08-20 09:00 to 2026-08-20 13:00 |
CLOSED Grant Fowler 2026-08-20 13:00 Entry complete, manway closed |
|
| PTW-133 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-20 06:30 to 2026-08-20 18:30 |
CLOSED Dale Whitaker 2026-08-20 18:30 Work complete, area left safe |
|
| PTW-134 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-20 06:30 to 2026-08-20 18:30 |
CLOSED Dale Whitaker 2026-08-20 18:30 Work complete, area left safe |
|
| PTW-135 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-20 06:30 to 2026-08-20 18:30 |
CLOSED Marcus Lee 2026-08-20 18:30 Work complete, area left safe |
|
| PTW-136 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-20 06:30 to 2026-08-20 18:30 |
CLOSED Tony Alvarez 2026-08-20 18:30 Work complete, area left safe |
|
| PTW-137 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-20 06:30 to 2026-08-20 18:30 |
CLOSED Priya Raman 2026-08-20 18:30 Work complete, area left safe |
|
| PTW-138 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-20 06:30 to 2026-08-20 18:30 |
CLOSED R. Okafor 2026-08-20 18:30 Work complete, area left safe |
|
| PTW-139 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-20 06:30 to 2026-08-20 18:30 |
CLOSED Wes Turner 2026-08-20 18:30 Work complete, area left safe |
|
| PTW-126 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-19 06:30 to 2026-08-19 18:30 |
CLOSED Dale Whitaker 2026-08-19 18:30 Work complete, area left safe |
|
| PTW-127 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-19 06:30 to 2026-08-19 18:30 |
CLOSED Dale Whitaker 2026-08-19 18:30 Work complete, area left safe |
|
| PTW-128 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-19 06:30 to 2026-08-19 18:30 |
CLOSED Marcus Lee 2026-08-19 18:30 Work complete, area left safe |
|
| PTW-129 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-19 06:30 to 2026-08-19 18:30 |
CLOSED Tony Alvarez 2026-08-19 18:30 Work complete, area left safe |
|
| PTW-130 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-19 06:30 to 2026-08-19 18:30 |
CLOSED Priya Raman 2026-08-19 18:30 Work complete, area left safe |
|
| PTW-131 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-19 06:30 to 2026-08-19 18:30 |
CLOSED R. Okafor 2026-08-19 18:30 Work complete, area left safe |
|
| PTW-132 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-19 06:30 to 2026-08-19 18:30 |
CLOSED Wes Turner 2026-08-19 18:30 Work complete, area left safe |
|
| PTW-119 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-18 06:30 to 2026-08-18 18:30 |
CLOSED Dale Whitaker 2026-08-18 18:30 Work complete, area left safe |
|
| PTW-120 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-18 06:30 to 2026-08-18 18:30 |
CLOSED Dale Whitaker 2026-08-18 18:30 Work complete, area left safe |
|
| PTW-121 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-18 06:30 to 2026-08-18 18:30 |
CLOSED Marcus Lee 2026-08-18 18:30 Work complete, area left safe |
|
| PTW-122 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-18 06:30 to 2026-08-18 18:30 |
CLOSED Tony Alvarez 2026-08-18 18:30 Work complete, area left safe |
|
| PTW-123 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-18 06:30 to 2026-08-18 18:30 |
CLOSED Priya Raman 2026-08-18 18:30 Work complete, area left safe |
|
| PTW-124 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-18 06:30 to 2026-08-18 18:30 |
CLOSED R. Okafor 2026-08-18 18:30 Work complete, area left safe |
|
| PTW-125 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-18 06:30 to 2026-08-18 18:30 |
CLOSED Wes Turner 2026-08-18 18:30 Work complete, area left safe |
|
| PTW-112 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-17 06:30 to 2026-08-17 18:30 |
CLOSED Dale Whitaker 2026-08-17 18:30 Work complete, area left safe |
|
| PTW-113 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-17 06:30 to 2026-08-17 18:30 |
CLOSED Dale Whitaker 2026-08-17 18:30 Work complete, area left safe |
|
| PTW-114 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-17 06:30 to 2026-08-17 18:30 |
CLOSED Marcus Lee 2026-08-17 18:30 Work complete, area left safe |
|
| PTW-115 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-17 06:30 to 2026-08-17 18:30 |
CLOSED Tony Alvarez 2026-08-17 18:30 Work complete, area left safe |
|
| PTW-116 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-17 06:30 to 2026-08-17 18:30 |
CLOSED Priya Raman 2026-08-17 18:30 Work complete, area left safe |
|
| PTW-117 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-17 06:30 to 2026-08-17 18:30 |
CLOSED R. Okafor 2026-08-17 18:30 Work complete, area left safe |
|
| PTW-118 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-17 06:30 to 2026-08-17 18:30 |
CLOSED Wes Turner 2026-08-17 18:30 Work complete, area left safe |
|
| PTW-105 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-16 06:30 to 2026-08-16 18:30 |
CLOSED Dale Whitaker 2026-08-16 18:30 Work complete, area left safe |
|
| PTW-106 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-16 06:30 to 2026-08-16 18:30 |
CLOSED Dale Whitaker 2026-08-16 18:30 Work complete, area left safe |
|
| PTW-107 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-16 06:30 to 2026-08-16 18:30 |
CLOSED Marcus Lee 2026-08-16 18:30 Work complete, area left safe |
|
| PTW-108 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-16 06:30 to 2026-08-16 18:30 |
CLOSED Marcus Lee 2026-08-16 18:30 Work complete, area left safe |
|
| PTW-109 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-16 06:30 to 2026-08-16 18:30 |
CLOSED Tony Alvarez 2026-08-16 18:30 Work complete, area left safe |
|
| PTW-110 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-16 06:30 to 2026-08-16 18:30 |
CLOSED Priya Raman 2026-08-16 18:30 Work complete, area left safe |
|
| PTW-111 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-16 06:30 to 2026-08-16 18:30 |
CLOSED Wes Turner 2026-08-16 18:30 Work complete, area left safe |
|
| PTW-098 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-15 06:30 to 2026-08-15 18:30 |
CLOSED Dale Whitaker 2026-08-15 18:30 Work complete, area left safe |
|
| PTW-099 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-15 06:30 to 2026-08-15 18:30 |
CLOSED Dale Whitaker 2026-08-15 18:30 Work complete, area left safe |
|
| PTW-100 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-15 06:30 to 2026-08-15 18:30 |
CLOSED Marcus Lee 2026-08-15 18:30 Work complete, area left safe |
|
| PTW-101 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-15 06:30 to 2026-08-15 18:30 |
CLOSED Marcus Lee 2026-08-15 18:30 Work complete, area left safe |
|
| PTW-102 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-15 06:30 to 2026-08-15 18:30 |
CLOSED Tony Alvarez 2026-08-15 18:30 Work complete, area left safe |
|
| PTW-103 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-15 06:30 to 2026-08-15 18:30 |
CLOSED Priya Raman 2026-08-15 18:30 Work complete, area left safe |
|
| PTW-104 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-15 06:30 to 2026-08-15 18:30 |
CLOSED Wes Turner 2026-08-15 18:30 Work complete, area left safe |
|
| PTW-091 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-14 06:30 to 2026-08-14 18:30 |
CLOSED Dale Whitaker 2026-08-14 18:30 Work complete, area left safe |
|
| PTW-092 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-14 06:30 to 2026-08-14 18:30 |
CLOSED Dale Whitaker 2026-08-14 18:30 Work complete, area left safe |
|
| PTW-093 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-14 06:30 to 2026-08-14 18:30 |
CLOSED Marcus Lee 2026-08-14 18:30 Work complete, area left safe |
|
| PTW-094 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-14 06:30 to 2026-08-14 18:30 |
CLOSED Marcus Lee 2026-08-14 18:30 Work complete, area left safe |
|
| PTW-095 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-14 06:30 to 2026-08-14 18:30 |
CLOSED Tony Alvarez 2026-08-14 18:30 Work complete, area left safe |
|
| PTW-096 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-14 06:30 to 2026-08-14 18:30 |
CLOSED Priya Raman 2026-08-14 18:30 Work complete, area left safe |
|
| PTW-097 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-14 06:30 to 2026-08-14 18:30 |
CLOSED Wes Turner 2026-08-14 18:30 Work complete, area left safe |
|
| PTW-084 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-13 06:30 to 2026-08-13 18:30 |
CLOSED Dale Whitaker 2026-08-13 18:30 Work complete, area left safe |
|
| PTW-085 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-13 06:30 to 2026-08-13 18:30 |
CLOSED Dale Whitaker 2026-08-13 18:30 Work complete, area left safe |
|
| PTW-086 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-13 06:30 to 2026-08-13 18:30 |
CLOSED Marcus Lee 2026-08-13 18:30 Work complete, area left safe |
|
| PTW-087 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-13 06:30 to 2026-08-13 18:30 |
CLOSED Marcus Lee 2026-08-13 18:30 Work complete, area left safe |
|
| PTW-088 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-13 06:30 to 2026-08-13 18:30 |
CLOSED Tony Alvarez 2026-08-13 18:30 Work complete, area left safe |
|
| PTW-089 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-13 06:30 to 2026-08-13 18:30 |
CLOSED Priya Raman 2026-08-13 18:30 Work complete, area left safe |
|
| PTW-090 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-13 06:30 to 2026-08-13 18:30 |
CLOSED Wes Turner 2026-08-13 18:30 Work complete, area left safe |
|
| PTW-076 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED Dale Whitaker 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-077 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED Dale Whitaker 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-078 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED Marcus Lee 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-079 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED Marcus Lee 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-080 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED Tony Alvarez 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-081 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED Priya Raman 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-082 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED R. Okafor 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-083 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-12 06:30 to 2026-08-12 18:30 |
CLOSED Wes Turner 2026-08-12 18:30 Work complete, area left safe |
|
| PTW-068 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED Dale Whitaker 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-069 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED Dale Whitaker 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-070 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED Marcus Lee 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-071 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED Marcus Lee 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-072 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED Tony Alvarez 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-073 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED Priya Raman 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-074 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED R. Okafor 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-075 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-11 06:30 to 2026-08-11 18:30 |
CLOSED Wes Turner 2026-08-11 18:30 Work complete, area left safe |
|
| PTW-060 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED Dale Whitaker 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-061 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED Dale Whitaker 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-062 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED Marcus Lee 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-063 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED Marcus Lee 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-064 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED Tony Alvarez 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-065 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED Priya Raman 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-066 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED R. Okafor 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-067 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-10 06:30 to 2026-08-10 18:30 |
CLOSED Wes Turner 2026-08-10 18:30 Work complete, area left safe |
|
| PTW-052 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED Dale Whitaker 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-053 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED Dale Whitaker 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-054 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED Marcus Lee 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-055 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED Marcus Lee 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-056 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED Tony Alvarez 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-057 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED Priya Raman 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-058 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED R. Okafor 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-059 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-09 06:30 to 2026-08-09 18:30 |
CLOSED Wes Turner 2026-08-09 18:30 Work complete, area left safe |
|
| PTW-044 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED Dale Whitaker 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-045 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED Dale Whitaker 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-046 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED Marcus Lee 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-047 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED Marcus Lee 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-048 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED Tony Alvarez 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-049 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED Priya Raman 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-050 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED R. Okafor 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-051 | Lockout / tagout (energy isolation) | MECH | Gear case, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Wes Turner issued by Carl Mendez, Superintendent | 2026-08-08 06:30 to 2026-08-08 18:30 |
CLOSED Wes Turner 2026-08-08 18:30 Work complete, area left safe |
|
| PTW-037 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-07 06:30 to 2026-08-07 18:30 |
CLOSED Dale Whitaker 2026-08-07 18:30 Work complete, area left safe |
|
| PTW-038 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-07 06:30 to 2026-08-07 18:30 |
CLOSED Dale Whitaker 2026-08-07 18:30 Work complete, area left safe |
|
| PTW-039 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-07 06:30 to 2026-08-07 18:30 |
CLOSED Marcus Lee 2026-08-07 18:30 Work complete, area left safe |
|
| PTW-040 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-07 06:30 to 2026-08-07 18:30 |
CLOSED Marcus Lee 2026-08-07 18:30 Work complete, area left safe |
|
| PTW-041 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-07 06:30 to 2026-08-07 18:30 |
CLOSED Tony Alvarez 2026-08-07 18:30 Work complete, area left safe |
|
| PTW-042 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-07 06:30 to 2026-08-07 18:30 |
CLOSED Priya Raman 2026-08-07 18:30 Work complete, area left safe |
|
| PTW-043 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-07 06:30 to 2026-08-07 18:30 |
CLOSED R. Okafor 2026-08-07 18:30 Work complete, area left safe |
|
| PTW-030 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-06 06:30 to 2026-08-06 18:30 |
CLOSED Dale Whitaker 2026-08-06 18:30 Work complete, area left safe |
|
| PTW-031 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-06 06:30 to 2026-08-06 18:30 |
CLOSED Dale Whitaker 2026-08-06 18:30 Work complete, area left safe |
|
| PTW-032 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-06 06:30 to 2026-08-06 18:30 |
CLOSED Marcus Lee 2026-08-06 18:30 Work complete, area left safe |
|
| PTW-033 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-06 06:30 to 2026-08-06 18:30 |
CLOSED Marcus Lee 2026-08-06 18:30 Work complete, area left safe |
|
| PTW-034 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-06 06:30 to 2026-08-06 18:30 |
CLOSED Tony Alvarez 2026-08-06 18:30 Work complete, area left safe |
|
| PTW-035 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-06 06:30 to 2026-08-06 18:30 |
CLOSED Priya Raman 2026-08-06 18:30 Work complete, area left safe |
|
| PTW-036 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-06 06:30 to 2026-08-06 18:30 |
CLOSED R. Okafor 2026-08-06 18:30 Work complete, area left safe |
|
| PTW-023 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-05 06:30 to 2026-08-05 18:30 |
CLOSED Dale Whitaker 2026-08-05 18:30 Work complete, area left safe |
|
| PTW-024 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-05 06:30 to 2026-08-05 18:30 |
CLOSED Dale Whitaker 2026-08-05 18:30 Work complete, area left safe |
|
| PTW-025 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-05 06:30 to 2026-08-05 18:30 |
CLOSED Marcus Lee 2026-08-05 18:30 Work complete, area left safe |
|
| PTW-026 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-05 06:30 to 2026-08-05 18:30 |
CLOSED Marcus Lee 2026-08-05 18:30 Work complete, area left safe |
|
| PTW-027 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-05 06:30 to 2026-08-05 18:30 |
CLOSED Tony Alvarez 2026-08-05 18:30 Work complete, area left safe |
|
| PTW-028 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-05 06:30 to 2026-08-05 18:30 |
CLOSED Priya Raman 2026-08-05 18:30 Work complete, area left safe |
|
| PTW-029 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-05 06:30 to 2026-08-05 18:30 |
CLOSED R. Okafor 2026-08-05 18:30 Work complete, area left safe |
|
| PTW-016 | Lockout / tagout (energy isolation) | MILL | Dryer section, tending side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-04 06:30 to 2026-08-04 18:30 |
CLOSED Dale Whitaker 2026-08-04 18:30 Work complete, area left safe |
|
| PTW-017 | Work at height | MILL | Dryer section, tending side Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Dale Whitaker issued by Carl Mendez, Superintendent | 2026-08-04 06:30 to 2026-08-04 18:30 |
CLOSED Dale Whitaker 2026-08-04 18:30 Work complete, area left safe |
|
| PTW-018 | Line break / opening process equipment | PIPE | Basement, drive side Open steam and condensate joints | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-04 06:30 to 2026-08-04 18:30 |
CLOSED Marcus Lee 2026-08-04 18:30 Work complete, area left safe |
|
| PTW-019 | Lockout / tagout (energy isolation) | PIPE | Basement, drive side Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-04 06:30 to 2026-08-04 18:30 |
CLOSED Marcus Lee 2026-08-04 18:30 Work complete, area left safe |
|
| PTW-020 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-04 06:30 to 2026-08-04 18:30 |
CLOSED Tony Alvarez 2026-08-04 18:30 Work complete, area left safe |
|
| PTW-021 | Lockout / tagout (energy isolation) | EI | Drive side and MCC room Daily group lockout verification, PM3 | Isolations verified at zero energy; permit posted at the work | Priya Raman issued by Carl Mendez, Superintendent | 2026-08-04 06:30 to 2026-08-04 18:30 |
CLOSED Priya Raman 2026-08-04 18:30 Work complete, area left safe |
|
| PTW-022 | Critical lift | RIG | Press section and north pad Press section picks with the 250 t crane | Isolations verified at zero energy; permit posted at the work | R. Okafor issued by Carl Mendez, Superintendent | 2026-08-04 06:30 to 2026-08-04 18:30 |
CLOSED R. Okafor 2026-08-04 18:30 Work complete, area left safe |
|
| PTW-014 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-03 06:30 to 2026-08-03 18:30 |
CLOSED Marcus Lee 2026-08-03 18:30 Work complete, area left safe |
|
| PTW-015 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-03 06:30 to 2026-08-03 18:30 |
CLOSED Tony Alvarez 2026-08-03 18:30 Work complete, area left safe |
|
| PTW-012 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-02 06:30 to 2026-08-02 18:30 |
CLOSED Marcus Lee 2026-08-02 18:30 Work complete, area left safe |
|
| PTW-013 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-02 06:30 to 2026-08-02 18:30 |
CLOSED Tony Alvarez 2026-08-02 18:30 Work complete, area left safe |
|
| PTW-010 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-08-01 06:30 to 2026-08-01 18:30 |
CLOSED Marcus Lee 2026-08-01 18:30 Work complete, area left safe |
|
| PTW-011 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-08-01 06:30 to 2026-08-01 18:30 |
CLOSED Tony Alvarez 2026-08-01 18:30 Work complete, area left safe |
|
| PTW-008 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-31 06:30 to 2026-07-31 18:30 |
CLOSED Marcus Lee 2026-07-31 18:30 Work complete, area left safe |
|
| PTW-009 | Work at height | SCAF | Dryer section, top tier Work above 6 ft on the dryer section | Isolations verified at zero energy; permit posted at the work | Tony Alvarez issued by Carl Mendez, Superintendent | 2026-07-31 06:30 to 2026-07-31 18:30 |
CLOSED Tony Alvarez 2026-07-31 18:30 Work complete, area left safe |
|
| PTW-007 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-30 06:30 to 2026-07-30 18:30 |
CLOSED Marcus Lee 2026-07-30 18:30 Work complete, area left safe |
|
| PTW-006 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-29 06:30 to 2026-07-29 18:30 |
CLOSED Marcus Lee 2026-07-29 18:30 Work complete, area left safe |
|
| PTW-005 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-28 06:30 to 2026-07-28 18:30 |
CLOSED Marcus Lee 2026-07-28 18:30 Work complete, area left safe |
|
| PTW-004 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-27 06:30 to 2026-07-27 18:30 |
CLOSED Marcus Lee 2026-07-27 18:30 Work complete, area left safe |
|
| PTW-003 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-26 06:30 to 2026-07-26 18:30 |
CLOSED Marcus Lee 2026-07-26 18:30 Work complete, area left safe |
|
| PTW-002 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-25 06:30 to 2026-07-25 18:30 |
CLOSED Marcus Lee 2026-07-25 18:30 Work complete, area left safe |
|
| PTW-001 | Hot work | PIPE | Basement, drive side Weld condensate header replacement section | Fire watch 60 min after; extinguisher at the work; combustibles cleared 35 ft | Marcus Lee issued by Carl Mendez, Superintendent | 2026-07-24 06:30 to 2026-07-24 18:30 |
CLOSED Marcus Lee 2026-07-24 18:30 Work complete, area left safe |
Source: safety_permit